A promise in a filing has three parts: a number, a date and the words around them.

Public companies say what they expect to do. A miner says it will reach so many exahash by a date, energize so many megawatts, or report revenue in a range. Those sentences are forward-looking statements, and every filing that carries one also carries a paragraph saying it may not come true. The paragraph is not the interesting part. The interesting part is that the sentence can be checked later, against the same company's own filings, without any opinion entering.

A statement can be checked only if it has a number and a date. "We expect significant growth" has neither, and this site's specification says such statements are recorded but not scored. "We are targeting 75 exahash by the end of 2025" has both, and it scores. In between sits the directional statement, a direction with no number, like "we expect to continue increasing our computing power": it can be checked for direction but not for size.

Where the promises live.

Four places, in order of formality. The annual report on Form 10-K, in the business section and the discussion of results, where a company describes what it is building and what it expects the building to produce. The quarterly results release, filed as exhibit 99.1 to a Form 8-K, where the current quarter's numbers come with the next quarter's expectations. The monthly production update, another exhibit 99.1, or an exhibit to a Form 6-K for a company organized outside the United States, where hashrate targets are restated month by month. And the investor deck, usually exhibit 99.2, where the targets are drawn as bars and the dates are printed under them.

The outcome lives in the same places, one or more periods later. That is what makes the check possible: the company that said 75 exahash by December is the company that reports its December hashrate in February. The ledger this article draws on records each promise with the document it came from and the document that answered it, and keeps only rows whose quote could be found in the cited document as an exact string.

Pin the number and the date, then read the outcome in the company's own words.

On 2025-07-01, with its June 2025 production update, MARA stated that it was targeting 75 exahash by the end of 2025. That is a number, 75 EH/s, and a date, 2025-12-31. The filing that answers it is the fourth-quarter shareholder letter filed as an 8-K exhibit on 2026-02-26, which reports 66.4 EH/s energized at year end and says, in the company's words, "While below our 75 EH/s target, this outcome reflects deliberate capital discipline."

One promise, worked. The variance is the delivered figure less the promised figure, as a share of the promised figure.
ItemFigure
Promised75 EH/s energized
By2025-12-31
Delivered66.4 EH/s at 2025-12-31
Shortfall8.6 EH/s
Varianceminus 11.5 percent
Company's words'While below our 75 EH/s target, this outcome reflects deliberate capital discipline'

Three things to notice. The company said the number itself, so no reading between lines was needed. The company gave its reason, and the ledger records the reason next to the shortfall rather than replacing it. And the variance is a fraction with the promise as its base, which is what lets a promise of 75 exahash and a promise of 1.7 exahash sit on the same chart.

Nine hashrate promises from seven companies, scored the same way.

Hashrate is the most common promise a miner makes, and the easiest to check, because every miner reports it every month or every quarter. Here are the nine on file whose date has passed and whose outcome is in a filing, drawn the same way: the figure promised beside the figure delivered.

Three of the nine landed on the number, three landed above it, and three fell short, by 2 to 12 percent.

EH/s · promises stated 2024-12 to 2025-12, outcomes filed 2025-08 to 2026-08 · as of 2026-09-06 · the ledger rows, each with both filings, in Sources

Three of the nine landed on the number, three landed above it, and three fell short, by 2 to 12 percent.
PromisePromised (EH/s)Delivered (EH/s)
MARA, 75 EH/s energized by 2025-12-317566.4
CleanSpark, 50 EH/s from 211.5 MW5050
CleanSpark, above the 45.6 EH/s fiscal 2025 average45.642.6
Bitdeer, 50 EH/s by year-end 20255055.2
Bitdeer, 40 EH/s by end of October 20254041.2
HIVE, 25 EH/s by US Thanksgiving 20252525
IREN, 50 EH/s installed by mid-20255050
Bitfarms (Keel), 18 EH/s by 2025-06-301817.7
Argo, 1.7 EH/s go-forward fleet1.72.4
The same nine, with the variance as a share of the promise. A plus sign is more than promised.
CompanyPromisedDeliveredVariance
MARA75 EH/s by 2025-12-3166.4 EH/sminus 11.5 percent
CleanSpark50 EH/s50 EH/s, June 20250.0 percent
CleanSparkmore than 45.6 EH/s42.6 EH/s, June 2026minus 6.6 percent
Bitdeer50 EH/s by 2025-12-3155.2 EH/splus 10.4 percent
Bitdeer40 EH/s by 2025-10-3141.2 EH/splus 3.0 percent
HIVE25 EH/s by 2025-11-2725 EH/s0.0 percent
IREN50 EH/s by 2025-06-3050 EH/s0.0 percent
Bitfarms (Keel)18 EH/s by 2025-06-3017.7 EH/sminus 1.7 percent
Argo1.7 EH/sup to 2.4 EH/splus 41.2 percent

Two rows need their footnotes. IREN met its 50 exahash and then, by its own account, took most of it apart: the fiscal 2026 annual report puts installed hashrate at 23.2 EH/s as machines were decommissioned to make room for AI cloud capacity. A promise met and then reversed on purpose is still a promise met; the reversal is a separate, later statement. And Argo's 2.4 is what its fleet "can generate", a capacity, set against a go-forward expectation of 1.7; the two are close cousins, not twins, and the ledger says so.

Revenue promised days before the result lands close; capacity promised a year out does not.

The ledger holds other kinds of promise, and the distance between the promise and its date matters more than the kind. A preliminary revenue figure, released two or three weeks before the results, is the company counting money it has already been paid; it lands within a few percent. A megawatt figure a year out depends on a substation, a utility and a construction crew.

Preliminary revenue landed within 18 percent and mostly within 6; the two megawatt promises made a year ahead fell 36 and 45 percent short.

percent of the promised figure · promises whose date has passed and whose outcome is filed, to 2026-09-06 · as of 2026-09-06 · the ledger rows, each with both filings, in Sources

Preliminary revenue landed within 18 percent and mostly within 6; the two megawatt promises made a year ahead fell 36 and 45 percent short.
PromiseVariance from the promise (percent of the promised figure)
Argo, 1.7 EH/s go-forward fleet+41.2%
Big Digital Energy, Q3 2025 revenue about $11.2 million+17.9%
Bitdeer, 50 EH/s by year-end 2025+10.4%
Big Digital Energy, nine-month revenue about $34.5 million+5.8%
TeraWulf, Q1 2026 revenue $30 to $35 million+4.6%
Bitdeer, 40 EH/s by end of October 2025+3.0%
TeraWulf, Q3 2025 revenue $48 to $52 million+1.2%
Big Digital Energy, 2025 revenue about $39.8 million0.0%
CleanSpark, 50 EH/s0.0%
HIVE, 25 EH/s by US Thanksgiving 20250.0%
IREN, 50 EH/s by mid-20250.0%
Bitfarms (Keel), 18 EH/s by 2025-06-30-1.7%
CleanSpark, above 45.6 EH/s-6.6%
MARA, 75 EH/s by 2025-12-31-11.5%
Greenidge (Vulcan), 161.5 MW by 2026-06-30-35.6%
Bitdeer, 221 MW at Massillon by Q1 2026-45.2%

The site's specification weights a promise by how specific it was and how far ahead it looked, for this reason: hitting a revenue figure announced three weeks early is not the same feat as hitting a hashrate figure announced a year early, and a ledger that counted them the same would flatter whoever makes the shortest promises.

Three kinds of miss that are not the same thing.

A shortfall in quantity is the plainest: Bitdeer said 221 megawatts at Massillon by the first quarter of 2026 and reported 121 online at the end of it. A slip in timing keeps the quantity and moves the date: Cipher's 2025 annual report expected the Stingray site energized in the first half of 2026, and its first-quarter deck aligned the work with a fourth-quarter energization; MARA's Long Ridge plant was to reach 505 megawatts nameplate in the second half of 2026 and the second-quarter 10-Q says the first quarter of 2027. A withdrawal replaces the promise with a different plan: IREN's installed hashrate went from a met 50 exahash to 23.2 because the company chose to.

The ledger records each with the company's own sentence about it, because the sentence is the fact. What the reader does with a moved date is the reader's business; what this site does is keep the first date next to the second so the move is visible at all. A beat gets the same treatment: Bitdeer's 55.2 exahash against a promised 50 is recorded as plus 10.4 percent, not as praise.

Check any promise in five steps.

  1. Copy the sentence from the filing, word for word, with the filing's date. A paraphrase cannot be verified later; a quote can.
  2. Write down the number and the date it names. If either is missing, note the statement as directional or vague and do not score it.
  3. Find the first filing after the date that reports the same measure, in the same unit and on the same basis: energized against energized, installed against installed, self-mining against self-mining.
  4. Subtract, and divide by the promise. Copy the company's own sentence about the outcome next to the result.
  5. Compare with the ledger, which holds every row above with both documents, and with the deals article for the megawatt promises that arrive inside a lease.

Sources

  1. MARA Q4 2025 shareholder letter, 8-K exhibit 99.1 filed 2026-02-26: 66.4 EH/s energized at 2025-12-31 against the 75 EH/s target set in the June 2025 production update, in the company's words 'While below our 75 EH/s target, this outcome reflects deliberate capital discipline' The target was stated on 2025-07-01 in the June 2025 production and operations update on the company's investor site.
  2. CleanSpark 10-K for fiscal 2024, filed 2024-12-03, Item 1: 211.5 MW under development 'expected to support approximately 50 EH/s of mining capacity'
  3. CleanSpark Q3 fiscal 2025 results, 8-K exhibit 99.1 filed 2025-08-07: 50 EH/s operational hashrate reached in June 2025
  4. CleanSpark 10-K for fiscal 2025, filed 2025-11-25: 'We expect to continue increasing our computing power through calendar year 2025 and beyond', from a 45.6 EH/s fiscal-year average
  5. CleanSpark 10-Q for the quarter ended 2026-06-30, filed 2026-08-06: 42.6 EH/s in June 2026
  6. Bitdeer November 2025 update, 6-K exhibit 99.1 filed 2025-12-15: 'By year-end 2025, we expect to achieve the 50 EH/s milestone'
  7. Bitdeer December 2025 update, 6-K exhibit 99.1 filed 2026-01-12: 55.2 EH/s self-mining
  8. Bitdeer August 2025 update, 6-K exhibit 99.1 filed 2025-09-12: the 40 EH/s self-mining target for the end of October 2025
  9. Bitdeer Q3 2025 results and October 2025 update, 6-K exhibit 99.1 filed 2025-11-10: 41.2 EH/s; and 'Construction of the 221 MW site is underway and full energization is expected in Q1 2026' for Massillon, Ohio
  10. Bitdeer March 2026 update, 6-K exhibit 99.1 filed 2026-04-15: 121 MW online at Massillon at the end of Q1 2026
  11. HIVE, 8-K exhibit 99.1 filed 2025-06-27: 'on track to deliver our target of 25 EH/s by US Thanksgiving'
  12. HIVE November 2025 production report, 8-K exhibit 99.1 filed 2025-12-16: 'Achieves 25 EH/s'
  13. HIVE, 8-K exhibit 99.3 filed 2025-10-28: 'HIVE targets 25 EH/s by late 2025 and 35 EH/s during 2026'
  14. HIVE Q1 fiscal 2027 results, 8-K exhibit 99.1 filed 2026-08-17: average operational hashrate 24.0 EH/s in the quarter ended 2026-06-30
  15. IREN June 2025 monthly update, 8-K exhibit 99.1 filed 2025-07-07: '50 EH/s installed - reached target self-mining capacity by month end, with further expansion paused'
  16. IREN 10-K for fiscal 2026, filed 2026-08-27: 23.2 EH/s installed at 2026-06-30 as miners were decommissioned for AI cloud capacity
  17. Bitfarms (now Keel Infrastructure), 6-K exhibit 99.2 filed 2025-03-27: the target of 18 EH/s operational and 21 EH/s installed by 2025-06-30
  18. Bitfarms Q2 2025 results, 6-K exhibit 99.1 filed 2025-08-12: 'an ending EH/s of 17.7 EHuM'
  19. Argo Blockchain, 6-K filed 2025-05-09: 'Our go forward hashrate, reflective of the machine sales, is expected to be 1.7 exahash'
  20. Argo Blockchain 20-F for 2025, filed 2026-04-30: a fleet of approximately 22,600 machines that can generate up to 2.4 EH/s at 2025-12-31
  21. TeraWulf preliminary Q1 2026 results, 8-K exhibit 99.1 filed 2026-04-14: revenue expected between $30 million and $35 million; and Q1 2026 results, 8-K exhibit 99.1 filed 2026-05-08: $34.0 million
  22. TeraWulf, 8-K exhibit 99.2 filed 2025-10-28: Q3 2025 revenue expected between $48 million and $52 million; and Q3 2025 results, 8-K exhibit 99.1 filed 2025-11-10: $50.6 million
  23. Big Digital Energy (as Mawson), 8-K exhibit 99.1 filed 2026-02-06: preliminary 2025 revenue of approximately $39.8 million; and the 10-K for 2025 filed 2026-03-31: $39.8 million
  24. Big Digital Energy (as Mawson), 8-K exhibit 99.1 filed 2025-10-17: preliminary Q3 2025 revenue of approximately $11.2 million and nine-month revenue of approximately $34.5 million; and the Q3 2025 results filed 2025-11-14: $13.2 million and $36.5 million
  25. Vulcan Infrastructure and Power (as Greenidge) Q1 2025 results, 8-K exhibit 99.1 filed 2025-05-15: 'a total near-term mining capacity of 161.5MW'; and Q2 2026 results, 8-K exhibit 99.1 filed 2026-08-14: 104 MW of existing energized capacity
  26. Cipher 10-K for 2025, filed 2026-02-24: 'We expect to energize the site in the first half of 2026' (Stingray); and the Q1 2026 deck, 8-K exhibit 99.2 filed 2026-05-05, aligning with a Q4 2026 energization
  27. MARA, 8-K filed 2026-04-30 (Long Ridge): 505 MW nameplate 'in H2 2026'; and the 10-Q for the quarter ended 2026-06-30, filed 2026-08-06: 'expected to increase to 505 MW in the first quarter of 2027'
  28. MinerTerminal ledger: every row above with its verbatim quote, its outcome sentence and both documents

This article renders spec 7.5 of the site's specification. Run the same figures on any company: the guidance ledger, every promise with its outcome.