Tier 1US filer (10-K, 10-Q, 8-K)fiscal year ends 31 December

Close
Market cap
Average cost per bitcoin held
$65,921 per BTC
Cost basis of the bitcoin held at Jun 30, 2026: $1,141,496,000 over 17,316 BTC. Consolidated: the count includes 8,002 bitcoin held by American Bitcoin, in which outside holders have a 46.37% stake, and 3,090 bitcoin pledged to Bitmain. The 10-Q calls the amount the cost basis of Bitcoin held and does not say how it is set. Source
Cost per bitcoin mined
Not stated
No filing, release or deck we read states it. The only cost to mine one bitcoin on file is American Bitcoin's, a Hut 8 subsidiary, from its own results release.
Bitcoin per share
141 BTC per million shares
Bitcoin held over common shares outstanding on Jun 30, 2026: 17,316 BTC over 123,190,559 common shares. Consolidated: the count includes 8,002 bitcoin held by American Bitcoin, in which outside holders have a 46.37% stake, so not all of it stands behind a Hut 8 share. Source
Cost basis per share
$9.27 a share
Cost basis of the bitcoin held over the same shares on Jun 30, 2026: $1,141,496,000 over 123,190,559 common shares. It is a cost basis, not the cost to mine. Source

Key figures

  • Hashrate
    about 28.1 EH/s
    In the 10-Q for the quarter ended Jun 30, 2026, source
    American Bitcoin's total owned fleet capacity after the miners delivered in April 2026; American Bitcoin is a subsidiary that outside holders own 46.37% of.
  • Fleet efficiency
    about 16 J/TH
    In the 10-Q for the quarter ended Jun 30, 2026, source
    American Bitcoin's overall portfolio efficiency after the miners delivered in April 2026; American Bitcoin is a subsidiary that outside holders own 46.37% of.
  • Bitcoin mined
    about 935 BTC
    Quarter ended Jun 30, 2026, source
    Counted for its ASIC Compute operations, which run through American Bitcoin, a subsidiary that outside holders own 46.37% of.
  • Bitcoin held
    about 17,316 BTC
    As of Jun 30, 2026, source
  • Power online
    42 MW
    As of Mar 31, 2026, source
  • Cash and net debt
    $233.6M
    As of Jun 30, 2026, source
  • Average shares
    118.5M shares
    Quarter ended Jun 30, 2026, source

Not stated in the filings, releases or decks we read: Cost per bitcoin, Power under contract, Power in development, Contracted revenue, AI and HPC revenue, Adjusted EBITDA, Build cost per megawatt, Other crypto held.

Daily closes through Oct 20, 2026.

HUTHut 8 Corp.

Nasdaq, USD

Close
$69.04+0.87 (+1.3%)
After hours
Not on file

Want candlesticks, moving averages or other miners on the same chart? Open HUT in the Chart Studio.

1 day: The feed records one close per session; intraday prices are not on file. 10 years: First close on file Jan 4, 2021, after this range starts.

Oct 20, 2026, $69.04

HUT daily close

Closing price per share in the selected range. As of Oct 20, 2026.

Method and sources

HUT closed at $69.04 on Oct 20, 2026, +0.87 (+1.3%) from the prior close. 252 of 252 shown sessions carry sourced volume.

Covers
HUT 1Y window, Oct 20, 2025 to Oct 20, 2026
Unit
USD per share

Source: How prices are sourced

HUT daily close
PeriodHUT (USD per share)
Oct 20, 202549.92
Oct 21, 202546.92
Oct 22, 202538.84
Oct 23, 202540.64
Oct 24, 202547.66
Oct 27, 202549.80
Oct 28, 202550.23
Oct 29, 202551.92
Oct 30, 202548.57
Oct 31, 202550.66
Nov 3, 202555.00
Nov 4, 202548.11
Nov 5, 202547.00
Nov 6, 202543.37
Nov 7, 202544.59
Nov 10, 202547.17
Nov 11, 202543.91
Nov 12, 202541.73
Nov 13, 202536.02
Nov 14, 202536.94
Nov 17, 202537.70
Nov 18, 202538.67
Nov 19, 202537.54
Nov 20, 202533.76
Nov 21, 202534.34
Nov 24, 202539.26
Nov 25, 202539.96
Nov 26, 202542.37
Nov 28, 202545.00
Dec 1, 202543.57
Dec 2, 202537.68
Dec 3, 202540.02
Dec 4, 202542.81
Dec 5, 202542.43
Dec 8, 202542.93
Dec 9, 202544.91
Dec 10, 202546.04
Dec 11, 202546.75
Dec 12, 202541.31
Dec 15, 202535.44
Dec 16, 202536.85
Dec 17, 202540.16
Dec 18, 202538.59
Dec 19, 202544.12
Dec 22, 202550.39
Dec 23, 202552.47
Dec 24, 202552.80
Dec 26, 202549.64
Dec 29, 202548.83
Dec 30, 202546.28
Dec 31, 202545.94
Jan 2, 202651.27
Jan 5, 202658.25
Jan 6, 202658.35
Jan 7, 202657.88
Jan 8, 202657.95
Jan 9, 202660.04
Jan 12, 202661.09
Jan 13, 202661.48
Jan 14, 202658.37
Jan 15, 202657.28
Jan 16, 202659.65
Jan 20, 202658.29
Jan 21, 202658.94
Jan 22, 202655.12
Jan 23, 202658.22
Jan 26, 202656.39
Jan 27, 202661.84
Jan 28, 202664.60
Jan 29, 202661.53
Jan 30, 202655.83
Feb 2, 202656.18
Feb 3, 202659.02
Feb 4, 202654.17
Feb 5, 202644.48
Feb 6, 202653.06
Feb 9, 202656.89
Feb 10, 202654.90
Feb 11, 202653.22
Feb 12, 202650.97
Feb 13, 202653.87
Feb 17, 202652.94
Feb 18, 202653.62
Feb 19, 202654.86
Feb 20, 202653.82
Feb 23, 202654.03
Feb 24, 202659.19
Feb 25, 202655.30
Feb 26, 202654.82
Feb 27, 202653.23
Mar 2, 202652.72
Mar 3, 202647.60
Mar 4, 202654.21
Mar 5, 202651.36
Mar 6, 202647.07
Mar 9, 202648.74
Mar 10, 202649.18
Mar 11, 202651.12
Mar 12, 202648.54
Mar 13, 202648.32
Mar 16, 202651.19
Mar 17, 202651.79
Mar 18, 202649.36
Mar 19, 202650.14
Mar 20, 202647.46
Mar 23, 202652.94
Mar 24, 202653.25
Mar 25, 202655.62
Mar 26, 202650.58
Mar 27, 202647.41
Mar 30, 202642.72
Mar 31, 202646.91
Apr 1, 202647.36
Apr 2, 202648.11
Apr 6, 202649.58
Apr 7, 202652.66
Apr 8, 202661.43
Apr 9, 202663.42
Apr 10, 202666.09
Apr 13, 202669.76
Apr 14, 202671.74
Apr 15, 202671.09
Apr 16, 202670.92
Apr 17, 202674.90
Apr 20, 202678.99
Apr 21, 202676.58
Apr 22, 202680.74
Apr 23, 202678.77
Apr 24, 202676.87
Apr 27, 202675.71
Apr 28, 202672.11
Apr 29, 202671.00
Apr 30, 202675.78
May 1, 202676.98
May 4, 202678.08
May 5, 202680.51
May 6, 2026108.94
May 7, 2026101.18
May 8, 202698.46
May 11, 2026102.19
May 12, 2026107.31
May 13, 2026108.32
May 14, 2026109.37
May 15, 2026102.47
May 18, 202696.20
May 19, 202693.31
May 20, 202696.51
May 21, 2026105.26
May 22, 2026105.90
May 26, 2026112.54
May 27, 2026117.64
May 28, 2026124.24
May 29, 2026124.83
Jun 1, 2026132.38
Jun 2, 2026133.02
Jun 3, 2026131.29
Jun 4, 2026127.76
Jun 5, 2026112.24
Jun 8, 2026119.60
Jun 9, 2026112.65
Jun 10, 2026105.68
Jun 11, 2026116.31
Jun 12, 2026118.86
Jun 15, 2026120.18
Jun 16, 2026121.48
Jun 17, 2026118.88
Jun 18, 2026124.44
Jun 22, 2026121.04
Jun 23, 2026120.51
Jun 24, 2026116.10
Jun 25, 2026117.68
Jun 26, 2026123.02
Jun 29, 2026118.27
Jun 30, 2026115.45
Jul 1, 2026105.79
Jul 2, 202697.14
Jul 6, 2026103.78
Jul 7, 202696.74
Jul 8, 2026106.11
Jul 9, 2026106.22
Jul 10, 2026102.22
Jul 13, 202699.17
Jul 14, 202698.33
Jul 15, 2026103.03
Jul 16, 202691.91
Jul 17, 202691.45
Jul 20, 2026100.93
Jul 21, 2026108.98
Jul 22, 2026109.86
Jul 23, 2026117.67
Jul 24, 2026109.99
Jul 27, 2026104.59
Jul 28, 2026101.14
Jul 29, 202688.18
Jul 30, 2026108.27
Jul 31, 2026107.63
Aug 3, 2026112.08
Aug 4, 2026101.16
Aug 5, 202692.76
Aug 6, 202690.65
Aug 7, 202688.59
Aug 10, 202685.66
Aug 11, 202688.78
Aug 12, 202690.77
Aug 13, 202682.95
Aug 14, 202685.44
Aug 17, 202688.04
Aug 18, 202680.79
Aug 19, 202682.08
Aug 20, 202688.65
Aug 21, 202680.86
Aug 24, 202679.56
Aug 25, 202685.50
Aug 26, 202685.00
Aug 27, 202687.13
Aug 28, 202679.42
Aug 31, 202678.64
Sep 1, 202677.57
Sep 2, 202680.68
Sep 3, 202688.09
Sep 4, 202693.55
Sep 8, 202699.49
Sep 9, 202695.92
Sep 10, 202690.60
Sep 11, 202698.60
Sep 14, 202691.13
Sep 15, 202687.09
Sep 16, 202689.82
Sep 17, 202690.99
Sep 18, 202698.74
Sep 21, 2026103.42
Sep 22, 2026106.61
Sep 23, 2026102.46
Sep 24, 2026101.54
Sep 25, 202696.82
Sep 28, 202692.71
Sep 29, 202692.86
Sep 30, 202686.10
Oct 1, 202686.36
Oct 2, 202689.63
Oct 5, 202689.27
Oct 6, 202692.22
Oct 7, 202689.30
Oct 8, 202679.59
Oct 9, 202684.27
Oct 12, 202685.24
Oct 13, 202683.61
Oct 14, 202674.87
Oct 15, 202676.09
Oct 16, 202667.75
Oct 19, 202668.17
Oct 20, 202669.04

HUT daily trading volume

Shares traded in each session in the selected range. As of Oct 20, 2026.

Method and sources

HUT recorded 4,621,831 shares of trading volume on Oct 20, 2026. Sourced volume is on file for 252 of 252 shown sessions.

Covers
HUT 1Y window, Oct 20, 2025 to Oct 20, 2026
Unit
shares

Source: How prices are sourced

HUT daily trading volume
PeriodVolume (shares)
Oct 20, 20257,154,155
Oct 21, 20257,270,901
Oct 22, 202518,572,846
Oct 23, 20256,522,838
Oct 24, 20259,821,837
Oct 27, 20255,479,717
Oct 28, 20257,101,408
Oct 29, 20256,508,240
Oct 30, 20256,152,713
Oct 31, 20255,966,531
Nov 3, 202513,903,357
Nov 4, 202513,124,932
Nov 5, 20258,304,478
Nov 6, 20257,385,226
Nov 7, 20257,305,224
Nov 10, 20259,491,772
Nov 11, 20257,169,708
Nov 12, 20256,956,204
Nov 13, 202512,287,797
Nov 14, 202510,567,616
Nov 17, 20257,121,202
Nov 18, 20256,886,067
Nov 19, 20255,576,973
Nov 20, 202510,315,855
Nov 21, 20257,261,883
Nov 24, 20255,943,580
Nov 25, 20255,113,414
Nov 26, 20253,949,864
Nov 28, 20253,185,702
Dec 1, 20254,636,118
Dec 2, 202514,390,396
Dec 3, 20254,916,990
Dec 4, 20255,002,246
Dec 5, 20253,542,102
Dec 8, 20252,733,030
Dec 9, 20254,035,626
Dec 10, 20255,539,644
Dec 11, 20254,620,513
Dec 12, 20257,796,019
Dec 15, 20258,771,100
Dec 16, 20254,509,980
Dec 17, 202522,652,537
Dec 18, 202512,025,715
Dec 19, 202511,501,210
Dec 22, 202513,541,502
Dec 23, 202511,310,560
Dec 24, 20252,419,832
Dec 26, 20254,417,318
Dec 29, 20253,862,426
Dec 30, 20253,258,204
Dec 31, 20252,741,297
Jan 2, 20266,545,970
Jan 5, 20269,875,411
Jan 6, 20265,939,139
Jan 7, 20264,329,949
Jan 8, 20264,263,471
Jan 9, 20265,159,919
Jan 12, 20263,578,723
Jan 13, 20263,959,803
Jan 14, 20265,327,348
Jan 15, 20264,506,465
Jan 16, 20265,427,860
Jan 20, 20265,003,690
Jan 21, 20265,996,253
Jan 22, 20263,705,473
Jan 23, 20266,351,534
Jan 26, 20264,753,425
Jan 27, 20265,734,259
Jan 28, 20266,000,604
Jan 29, 20265,249,937
Jan 30, 20267,467,055
Feb 2, 20264,535,137
Feb 3, 20266,191,977
Feb 4, 20269,825,568
Feb 5, 202611,391,237
Feb 6, 20266,165,859
Feb 9, 20265,153,913
Feb 10, 20263,649,216
Feb 11, 20263,961,467
Feb 12, 20263,728,037
Feb 13, 20263,670,739
Feb 17, 20263,416,044
Feb 18, 20263,542,689
Feb 19, 20262,235,763
Feb 20, 20263,855,516
Feb 23, 20267,617,847
Feb 24, 20267,128,533
Feb 25, 20266,928,725
Feb 26, 20263,969,787
Feb 27, 20264,752,715
Mar 2, 20264,021,987
Mar 3, 20264,243,152
Mar 4, 20264,835,406
Mar 5, 20263,429,832
Mar 6, 20264,175,145
Mar 9, 20263,647,206
Mar 10, 20264,504,188
Mar 11, 20263,937,249
Mar 12, 20263,681,900
Mar 13, 20262,725,224
Mar 16, 20263,510,902
Mar 17, 20262,547,895
Mar 18, 20263,790,092
Mar 19, 20263,577,404
Mar 20, 20264,336,277
Mar 23, 20267,279,597
Mar 24, 20264,242,616
Mar 25, 20264,528,909
Mar 26, 20264,985,695
Mar 27, 20264,668,604
Mar 30, 20264,809,981
Mar 31, 20264,270,501
Apr 1, 20263,418,163
Apr 2, 20263,688,874
Apr 6, 20262,074,315
Apr 7, 20264,380,059
Apr 8, 202611,123,429
Apr 9, 20268,390,138
Apr 10, 20265,824,932
Apr 13, 20265,636,367
Apr 14, 20264,913,936
Apr 15, 20265,361,623
Apr 16, 20263,454,905
Apr 17, 20266,005,975
Apr 20, 20264,876,901
Apr 21, 20264,410,533
Apr 22, 20263,965,004
Apr 23, 20264,367,399
Apr 24, 20265,310,972
Apr 27, 20262,540,353
Apr 28, 20263,867,260
Apr 29, 20262,312,366
Apr 30, 20264,427,797
May 1, 20262,745,561
May 4, 20263,035,304
May 5, 20263,717,705
May 6, 202619,778,869
May 7, 20269,280,448
May 8, 20265,297,415
May 11, 20265,772,444
May 12, 20264,582,371
May 13, 20264,664,088
May 14, 20264,560,167
May 15, 20264,781,090
May 18, 20265,593,962
May 19, 20265,234,987
May 20, 20264,110,972
May 21, 20264,449,830
May 22, 20263,307,150
May 26, 20265,049,623
May 27, 20264,067,322
May 28, 20264,850,630
May 29, 20263,951,994
Jun 1, 20264,317,345
Jun 2, 20263,644,251
Jun 3, 20263,281,450
Jun 4, 20263,740,540
Jun 5, 20266,012,835
Jun 8, 20263,601,584
Jun 9, 20264,528,313
Jun 10, 20262,687,036
Jun 11, 20264,294,706
Jun 12, 20262,846,962
Jun 15, 20263,643,791
Jun 16, 20263,500,003
Jun 17, 20264,731,211
Jun 18, 20264,299,977
Jun 22, 20263,833,775
Jun 23, 20263,566,899
Jun 24, 20263,875,703
Jun 25, 20263,191,660
Jun 26, 202611,587,066
Jun 29, 20263,932,282
Jun 30, 20263,724,152
Jul 1, 20266,183,585
Jul 2, 20265,621,743
Jul 6, 20264,205,128
Jul 7, 20264,172,075
Jul 8, 20263,444,412
Jul 9, 20263,078,907
Jul 10, 20262,550,933
Jul 13, 20262,563,634
Jul 14, 20262,721,446
Jul 15, 20264,125,035
Jul 16, 20264,460,194
Jul 17, 20264,603,859
Jul 20, 20267,269,371
Jul 21, 20264,274,230
Jul 22, 20262,841,088
Jul 23, 20266,157,967
Jul 24, 20263,679,968
Jul 27, 20263,993,544
Jul 28, 20264,656,580
Jul 29, 20267,205,104
Jul 30, 20265,492,177
Jul 31, 20264,589,664
Aug 3, 20263,503,311
Aug 4, 20266,953,609
Aug 5, 20264,717,468
Aug 6, 20263,050,880
Aug 7, 20266,837,852
Aug 10, 20263,234,932
Aug 11, 20263,453,136
Aug 12, 20264,517,508
Aug 13, 20265,993,402
Aug 14, 20265,568,246
Aug 17, 20263,953,457
Aug 18, 20266,375,791
Aug 19, 20265,722,407
Aug 20, 20264,476,959
Aug 21, 20269,588,312
Aug 24, 20264,712,634
Aug 25, 20263,476,968
Aug 26, 20264,054,863
Aug 27, 20264,722,300
Aug 28, 20264,438,671
Aug 31, 20264,201,466
Sep 1, 20263,680,023
Sep 2, 20263,719,621
Sep 3, 20265,474,239
Sep 4, 20265,733,713
Sep 8, 20265,644,997
Sep 9, 20262,860,622
Sep 10, 20263,474,716
Sep 11, 20265,684,511
Sep 14, 20266,287,953
Sep 15, 20263,819,441
Sep 16, 20263,993,372
Sep 17, 20265,452,478
Sep 18, 20267,389,445
Sep 21, 20265,715,789
Sep 22, 20265,382,635
Sep 23, 20263,199,780
Sep 24, 20262,496,537
Sep 25, 20262,635,482
Sep 28, 20262,142,337
Sep 29, 20262,486,435
Sep 30, 20267,183,562
Oct 1, 20264,725,713
Oct 2, 20264,620,075
Oct 5, 20263,485,196
Oct 6, 20265,713,108
Oct 7, 202610,012,726
Oct 8, 202610,309,752
Oct 9, 20266,377,006
Oct 12, 20263,474,788
Oct 13, 20264,917,236
Oct 14, 202612,867,545
Oct 15, 202616,751,259
Oct 16, 20266,194,612
Oct 19, 20265,156,627
Oct 20, 20264,621,831
Open
$66.69
High
$71.86
Low
$64.88
Volume
4.62M
P/E
Not on file
Market cap
$8.51B
52-week high
$140.80
52-week low
$31.67
Average volume
5.29M
Yield
Not on file
Beta
4.32
EPS
-$1.27

Operations

Definitions
Hashrate, realized
5th of 11
Fleet efficiency
3rd of 7
Cost per bitcoin with depreciation
Not stated

No filing, release or deck we read states it as a cost per bitcoin with depreciation. The only cost to mine one bitcoin on file is American Bitcoin's, a Hut 8 subsidiary, from its own results release.

Direct cost per bitcoin: not stated

Bitcoin held
2nd of 15
EV per EH/s
2nd of 6
Revenue per MW, annualized
10th of 11
Months of liquidity
Not stated

Not stated in the filings, releases or decks we read: Hut 8's cost to mine a bitcoin, so months of liquidity cannot be formed. The only cost on file belongs to American Bitcoin, a Hut 8 subsidiary.

Data read Sep 6, 2026. The cost per bitcoin is read from the filings and releases themselves, as of Oct 14, 2026. Not stated means no filing, release or deck we read gives one, and over a year old means the newest one on file is too old to show, so its figure and period are given in words. Open a figure for its period, status and source.

Figure labels

Solid means reported by the company. Hatched means computed here from sourced inputs. Not comparable means the company uses a different definition. Not stated means no filing, release or deck we read gives it.

HPC and AI deals

Every company's rows

4 HPC and AI rows on file: 3 signed or operating, 1 announced or under a letter of intent. Contracted or operating critical IT capacity for this company is 949 MW.

Agreements on file: counterparty, status, announced, megawatts, term, disclosed value, document
Document
Undisclosed 'multi-trillion-dollar market capitalization, high-investment-grade technology company' (rated AA- or higher)Beacon Point Phase 1, Nueces County, TexasContracted2026-Q1exact date not disclosed; first disclosed in the Q1 2026 10-Q and release of May 6, 2026
Same undisclosed high-investment-grade tenant as Phase 1Beacon Point Phase 2, Nueces County, TexasContractedJul 20, 2026
Fluidstack Ltd. (tenant), lease payments backstopped by Google (Alphabet subsidiary); strategic partnership with Anthropic PBCRiver Bend, West Feliciana Parish (St. Francisville), LouisianaContractedDec 17, 2025
8-K EX-99.1 Dec 17, 2025no 2nd source
Fluidstack (ROFO) / Anthropic (joint diligence and development)River Bend expansion phases, LouisianaAnnounced intentionDec 17, 2025, announced intentionnot statednot disclosed

News

29 company releases on file, newest first. Source of truth: Hut 8: Press Releases. This index reads the allowed newsroom, wire or SEC sources listed for this company.

Show more (14)
  1. Hut 8 Announces Sale of 310 MW Power Portfolio to TransAlta Following Successful Optimization and Long-Term Contract WinsDeal
  2. Hut 8 Reports Third Quarter 2025 ResultsEarnings
  3. Hut 8 Reports Second Quarter 2025 ResultsEarnings
  4. Hut 8 Subsidiary American Bitcoin Announces Go-Public TransactionOther
  5. Hut 8 Reports First Quarter 2025 ResultsEarnings
  6. Hut 8 and Eric Trump Launch American Bitcoin to Set a New Standard in Bitcoin MiningOther
  7. Hut 8 Reports Fourth Quarter and Full Year 2024 ResultsEarnings
  8. Hut 8 Reports Third Quarter 2024 ResultsEarnings
  9. Hut 8 Announces Early Payoff of Outstanding LoanFinancing
  10. Hut 8 Reports Second Quarter 2024 ResultsEarnings
  11. Hut 8 Announces $150 Million Strategic Investment from Coatue to Partner in Building Next Generation AI Infrastructure PlatformOther
  12. Hut 8 Reports First Quarter 2024 ResultsEarnings
  13. Hut 8 Reports Operating and Financial Results for the Six Months Ended December 31, 2023Earnings
  14. Hut 8 and USBTC Announce Completion of Business CombinationDeal

Sentiment

A 0 to 100 index of how the market and press talk about this company, as of Oct 1, 2026. It describes tone and is not advice.

49Neutral
  • Positive headlines: 1
  • Neutral headlines: 2
  • Negative headlines: 0
Price moves
37 (+11.0% over 20 days)
News tone
60 (3 headlines)
Reddit tone
Source not connected yet
Forum tone
No source yet

Against the sector

Hut 8 Corp. against the median of the covered miners that state each figure. For Bitcoin mined, only the miners that state it for the same period count: the same length of time, ending on the same day. The dashed ring is that median; a figure at the outer edge is twice it or more.

HashrateBitcoin minedPower onlinePower under contractPower in development
Hut 8 Corp. against the sector median
FigureHut 8 Corp.Sector median
Hashrateabout 28.1 EH/s15.7 EH/s (15 miners)
Bitcoin minedabout 935 BTC 3 months640.5 BTC (10 miners)
Power online42 MW76 MW (8 miners)
Power under contractNot stated700 MW (5 miners)
Power in developmentNot stated654 MW (9 miners)

Hashrate, Power online and Power under contract: the sector medians are made of readings only, each as of its own date, and those dates run from Oct 14, 2025 to August 2026.

Power in development: the sector median mixes four company targets with five readings, each as of its own date, and those dates run from May 31, 2026 to Sep 10, 2026.

Hut 8 Corp. does not state Power under contract, Power in development in a form we read, so that spoke is left empty rather than drawn as zero.

Financial statements

Definitions

Seven filing figures from XBRL. Open a figure for its period, concept, filing history and source.

Revenue
Net income (loss)
Cash and cash equivalents
Digital assets at fair value
Digital asset units held
Shares outstanding
Total assets

Revenue was $74.9M for the quarter ended Jun 30, 2026.The share count moved +16.8% (+17.7M shares) between Aug 6, 2025 and Jul 31, 2026.260 filings are on EDGAR. The latest is Form 4 from Sep 30, 2026.

Shares outstanding

Each dated count the company filed. As of Oct 14, 2026.

Method and sources

Hut 8 Corp.'s share count rose 16.8% in the year to Jul 31, 2026 (17.7M more shares). Since Jun 30, 2022 it has risen from 41.5M to 123.3M.

Covers
27 dated counts as filed, Jun 30, 2022 to Jul 31, 2026
Unit
shares

Source: Form 10-Q Aug 4, 2026

Shares outstanding
PeriodShares outstanding (shares)
Jun 30, 202241.5M
Jun 30, 202343.2M
Sep 30, 202345.7M
Nov 30, 202388.6M
Dec 18, 202389M
Dec 31, 202389M
Mar 27, 202489.2M
Mar 31, 202488.5M
May 14, 202490.4M
Jun 30, 202490.9M
Aug 12, 202491.1M
Sep 30, 202493.5M
Nov 12, 202493.6M
Dec 31, 202499.5M
Feb 28, 2025103.9M
Mar 31, 2025104.2M
May 7, 2025104.2M
Jun 30, 2025104.4M
Aug 6, 2025105.5M
Sep 30, 2025106.3M
Nov 3, 2025108M
Dec 31, 2025110.1M
Feb 24, 2026110.9M
Mar 31, 2026112.5M
May 4, 2026112.6M
Jun 30, 2026123.2M
Jul 31, 2026123.3M

Filings disagree on one date. The latest filed value is shown.

Why some counts are left out

At Jun 30, 2023, 43,193,201 (a balance-sheet count, 10-KT filed Mar 28, 2024) against 45,696,749 (a balance-sheet count, 10-Q filed Dec 19, 2023).

Each point is an XBRL share count from the linked filing. A filing can tag a count without printing it in the document.

Dilution, one year (share count change)

A rising share count is dilution: each existing share owns a smaller slice of the company. A falling count is the reverse.

At-the-market programs

3 at-the-market documents on file, the largest program $1B, the most recent filed Feb 25, 2026.

An at-the-market program is a standing authority to sell shares into the market, one way the share count above can rise; it never explains a fall. The size is the authority, not what has been sold: 1 of 3 state how much is left, and this page never estimates the difference. Whether shares were actually sold shows in the share count above, which is where to look. Tap or hover a size for the text it was read from.

At-the-market programs on file: filed, form, program size, stated remaining, sales agents, document
Feb 25, 2026Form 424B5$715.8Mnot namedSales Agreement, Dec 4, 2024
Aug 22, 2025Form 424B5not statedCantor Fitzgerald & CoSales Agreement
Dec 4, 2024Form 424B5not statedCantor Fitzgerald & CoSales Agreement

Cover-page language classifies the filing, not the form; every fact carries the sentence it came from; remaining capacity is null unless the document states it. Excluded: 424B3 (resale or selling-shareholder supplement), 424B7 (selling-securityholder supplement).

Quarterly revenue

Each quarter as filed. Hatched ones are worked out from the fiscal year. As of Oct 14, 2026.

Method and sources

Revenue was $74.9M in the quarter to Jun 30, 2026, up from $41.3M in the same quarter a year before, to Jun 30, 2025.

Covers
12 quarters as tagged and 3 quarters derived from the fiscal year less its three reported quarters (hatched), Sep 30, 2022 to Jun 30, 2026
Unit
USD

Source: 10-Q Aug 4, 2026

Quarterly revenue
PeriodRevenue (USD)
Sep 30, 2022$33.5M
Mar 31, 2023$15.6M
Jun 30, 2023$20.5M
Sep 30, 2023$21.7M
Dec 31, 2023$38.2M (derived)
Mar 31, 2024$51.7M
Jun 30, 2024$35.2M
Sep 30, 2024$43.7M
Dec 31, 2024$31.7M (derived)
Mar 31, 2025$21.8M
Jun 30, 2025$41.3M
Sep 30, 2025$83.5M
Dec 31, 2025$88.5M (derived)
Mar 31, 2026$71M
Jun 30, 2026$74.9M

Quarterly net income

Each quarter as filed. Hatched ones are worked out from the fiscal year. As of Oct 14, 2026.

Method and sources

8 of the 15 quarters were a loss.

Covers
12 quarters as tagged and 3 quarters derived from the fiscal year (hatched), Sep 30, 2022 to Jun 30, 2026
Unit
USD

Source: 10-Q Aug 4, 2026

Quarterly net income
PeriodNet income (USD)
Sep 30, 2022-$560K
Mar 31, 2023$17.3M
Jun 30, 2023-$1.7M
Sep 30, 2023-$4.4M
Dec 31, 2023$10.6M (derived)
Mar 31, 2024$250.9M
Jun 30, 2024-$71.9M
Sep 30, 2024$647K
Dec 31, 2024$151.7M (derived)
Mar 31, 2025-$133.9M
Jun 30, 2025$137.3M
Sep 30, 2025$50.1M
Dec 31, 2025-$301.5M (derived)
Mar 31, 2026-$219.8M
Jun 30, 2026-$150.2M

Cash and equivalents

Each balance, as filed. As of Oct 14, 2026.

Method and sources

Cash and equivalents were $233.6M at Jun 30, 2026, up from $216.3M a year before, at Jun 30, 2025.

Covers
16 balances as tagged, Sep 30, 2022 to Jun 30, 2026
Unit
USD

Source: 10-Q Aug 4, 2026

Cash and equivalents
PeriodCash (USD)
Sep 30, 2022$21.4M
Dec 31, 2022$6.7M
Mar 31, 2023$8.7M
Jun 30, 2023$10.4M
Sep 30, 2023$12.7M
Dec 31, 2023$30.5M
Mar 31, 2024$11.5M
Jun 30, 2024$176.1M
Sep 30, 2024$72.9M
Dec 31, 2024$85M
Mar 31, 2025$108.4M
Jun 30, 2025$216.3M
Sep 30, 2025$33.5M
Dec 31, 2025$44.9M
Mar 31, 2026$160M
Jun 30, 2026$233.6M

Digital assets at fair value

Each balance, as filed. As of Oct 14, 2026.

Method and sources

Digital assets at fair value were $1.04B at Jun 30, 2026, down from $1.14B a year before, at Jun 30, 2025.

Covers
12 balances as tagged, Jun 30, 2023 to Jun 30, 2026
Unit
USD

Source: 10-Q Aug 4, 2026

Digital assets at fair value
PeriodDigital assets (USD)
Jun 30, 2023$851K
Dec 31, 2023$388.5M
Mar 31, 2024$648.9M
Jun 30, 2024$570.5M
Sep 30, 2024$576.5M
Dec 31, 2024$949.5M
Mar 31, 2025$847.2M
Jun 30, 2025$1.14B
Sep 30, 2025$1.56B
Dec 31, 2025$1.37B
Mar 31, 2026$1.11B
Jun 30, 2026$1.04B

Monthly production

No monthly release for this company was found in the 12 months from August 2025 to July 2026, on any of the 10 feeds checked on Sep 6, 2026.

No monthly release found. August and September 2025 sit before every index this run could read (the PR Newswire organisation page starts on Oct 16, 2025 and the EDGAR pass's exhibits start on Nov 4, 2025), so they were closed by listing every 8-K Hut 8 filed in their publication windows: three filings, none carrying an EX-99 exhibit, and nothing at all filed between Sep 3, 2025 and Nov 4, 2025. A wire release before Oct 16, 2025 would still be outside what was read. The PR Newswire organisation page carries 21 releases from Oct 16, 2025 to Aug 4, 2026 and none is monthly; hut8.com renders its press-release list with JavaScript and serves no sitemap; the EDGAR pass read the EDGAR exhibits for the window and found none.

10 feeds, listings and sitemaps were requested for this company, 4 answered: https://hut8.com/investors/; https://hut8.com/investors/news (http 404); https://hut8.com/news (http 404); https://hut8.com/news-insights/press-releases; https://hut8.com/sitemap-index.xml (http 404); https://hut8.com/sitemap.xml (http 404); https://hut8.com/sitemap_index.xml (http 404); https://hut8.com/wp-sitemap.xml (http 404); https://www.prnewswire.com/news/hut-8-corp./; https://www.prnewswire.com/news/hut-8-corp./?page=2&pagesize=25.

The EDGAR pass fetched 12 EX-99 documents for the window and read 10 of them; 0 are monthly.

How far back each index this site read reaches:

  • The EDGAR pass's EX-99 exhibits: Nov 4, 2025
  • hut8.com press releases: not indexable: rendered by JavaScript, no sitemap
  • prnewswire.com organisation listing: Oct 16, 2025

August 2025 and September 2025 sat before every index this site could read, so they were closed directly against EDGAR. None of the three carries an EX-99 exhibit, and nothing was filed in the October publication window, so no monthly release for August or September 2025 reached EDGAR. Hut 8 began distributing on PR Newswire on Oct 16, 2025, so a wire release before that date is still outside what was read.

Hosts that answered with a block rather than a page, and were routed around rather than worked past:

  • https://hut8.com/investors/news: http 404
  • https://hut8.com/news: http 404
  • https://hut8.com/sitemap-index.xml: http 404
  • https://hut8.com/sitemap.xml: http 404
  • https://hut8.com/sitemap_index.xml: http 404
  • https://hut8.com/wp-sitemap.xml: http 404

12 EX-99 exhibits and investor-relations releases from this window were read. 10 of them carry a classification in the file: 6 other, 4 quarterly or annual. The other 2 were read and left unclassified, so this count says what was labelled, not what was looked at. Hashrate, bitcoin mined, bitcoin held, energized megawatts and fleet efficiency appear in the quarterly filings instead, where this site takes them from XBRL. A cost per bitcoin is read from the filing or release that states it, on the company's own definition, and not from XBRL.

Insider sales and pay

HUT insiders sold $15.2M and bought $0 of stock in the open market from Oct 14, 2025 to Oct 14, 2026.

From the Form 4s each insider filed; $4.7M of the sales were under a 10b5-1 plan. The company total counts each transaction once. As of Oct 14, 2026.

Every person, their pay by year and every sale with its date

Net open-market sales per person, twelve months

Net open-market sales per person, twelve months
Joseph Flinndirector$4.5M net soldJun 15, 2026
Rick Rickertsendirector$3.7M net soldMay 13, 2026
Victor Semahofficer (Chief Legal Officer)$2.3M net soldJun 18, 2026, May 4, 2026, Mar 10, 2026
Amy Marie Wilkinsondirector$2M net soldMay 26, 2026
Mayo A Shattuck IIIdirector$2M net soldSep 28, 2026
Sean Glennanofficer (Chief Financial Officer)$734.5K net soldAug 25, 2026, Mar 10, 2026

Total pay per named executive officer, latest year in the DEF 14A filed Apr 28, 2026

Total pay per named executive officer, latest year in the proxy
Asher GenootChief Executive Officer$239.9M2025
Sean GlennanChief Financial Officer$2.1M2025
Michael HoChief Strategy Officer$121.2M2025
Victor SemahChief Legal Officer & Corporate Secretary$2.2M2025

Asher Genoot's 2025 total pay is 2.08% of the market capitalization of $11.53B on Sep 4, 2026.

Asher Genoot's 2025 total pay is at the 100th percentile of the latest pay of 61 named officers at 15 miners (n=61), more than 60 of the other 60; among the chief executives, the 100th (n=19). It is 47.32 times their median of $5.1M.

Guidance

4 guidance statements on the ledger, 1 with an outcome document: 1 settled, 0 still open.

2 statements have no outcome document yet. 3 of the 4 are specific enough to score. One statement is a reported result: already in hand when stated, so it is shown but never scored. 3 of the selected rows for this company are specific, which is what the accuracy score would rest on. Every company's statements.

Aug 4, 2026specificno outcome documentfilings and press releasesinitial data hall delivery at River Bend
Advanced the buildout of River Bend, targeted for initial data hall delivery in the second quarter of 2027.
Projected
initial data hall delivered, second quarter of 2027
Actual
no outcome document yet
Variance
not resolved

the target date has not passed

Said in 8-K EX-99.1 Aug 4, 2026 (Q2 2026 results), grade verified. No outcome document has been read for this statement yet.

Aug 4, 2026specificno outcome documentfilings and press releasesinitial energization and data hall delivery at Beacon Point
Commenced the buildout of Beacon Point, with construction of Phase 1 and the campus substation underway, targeted for initial energization in the first quarter of 2027 and initial data hall delivery in the third quarter of 2027.
Projected
initial energization, then initial data hall delivery, first quarter of 2027 (energization), third quarter of 2027 (data hall)
Actual
no outcome document yet
Variance
not resolved

the target date has not passed

Said in 8-K EX-99.1 Aug 4, 2026 (Q2 2026 results), grade verified. No outcome document has been read for this statement yet.

Feb 25, 2026reported resultfilings and press releasesnew development capacity announced
Announced plans to develop four new sites with more than 1,500 MW of total capacity across the United States, including 330 MW of utility capacity at the Company's River Bend campus in Louisiana.

Reported result, not a promise. The company reports plans it had already announced (in its results of Nov 4, 2025) and states no date to meet. It looks back, so it is shown but never scored.

Projected
more than 1,500 MW across four new sites
Actual
the statement itself reports the result
Variance
not applicable

Said in 8-K EX-99.1 Feb 25, 2026 (Q4 and full year 2025 results), grade verified. No outcome document has been read for this statement; it reports a result already in hand.

Dec 17, 2025specificsettledinvestor presentationssale of the 310 MW Ontario power generation portfolio
One of four sites comprising the 310 MW portfolio of power generation assets Hut 8 expects to sell to TransAlta in early Q1 2026, subject to customary closing conditions including regulatory approval
Projected
310 MW portfolio sold, early Q1 2026
Actual
the sale completed; the Q4 2025 release of Feb 25, 2026 states the transaction closed in February 2026 as of May 6, 2026
Variance
not computed

The outcome document says: Completed the sale of the Company's 310 MW portfolio of four natural gas-fired power plants in Ontario to TransAlta Corporation.

Said in 8-K EX-99.2 Dec 17, 2025 (River Bend lease investor presentation), grade verified. Outcome from 8-K EX-99.1 May 6, 2026 (Q1 2026 results), grade verified.

Statements corpus

Rule

13 documents of HUT in the window Oct 13, 2025 to Oct 14, 2026, 13 read, across filings and press releases (10 read), investor presentations (3 read); 33 candidate statements, 33 formal and 0 informal.

filings and press releases
10 read, 26 candidates
investor presentations
3 read, 7 candidates
earnings calls
none in the window
X posts
not captured yetnot captured: reading X needs its paid API, a purchase still to be decided
interviews
not captured yetnot captured: transcription is not built yet; eight interviews were listed on Sep 6, 2026, none transcribed

The newest 8 candidates

  1. Beacon Point Phase 1, representing approximately $9.8 billion in expected base-term contract value and approximately $655.0 million of expected average annual NOI on a triple-net, take-or-pay basis and bringing total base-term contract value across the campus to approximately $19.6 billion and expected average annual NOI to approximately $1.3 billion.

    Aug 4, 2026, earnings release; mentions contract. The document

  2. Commenced the buildout of Beacon Point, with construction of Phase 1 and the campus substation underway, targeted for initial energization in the first quarter of 2027 and initial data hall delivery in the third quarter of 2027.

    Aug 4, 2026, earnings release; dated first quarter of 2027. The document

  3. Advanced the buildout of River Bend, targeted for initial data hall delivery in the second quarter of 2027.

    Aug 4, 2026, earnings release; dated second quarter of 2027. The document

  4. To date, it has produced data center leases representing 949 MW of contracted IT capacity, approximately $26.6 billion of expected aggregate base-term value leased or backstopped by investment-grade counterparties, more than $1.75 billion of expected average annual NOI, and $7.5 billion of investment-grade construction financing.

    Aug 4, 2026, earnings release; mentions power, capex. The document

  5. Facilities representing 1,330 MW of utility capacity in active construction across River Bend and Beacon Point, targeted for initial data hall delivery in Q2 2027 and Q3 2027, respectively.

    Aug 4, 2026, earnings release; mentions power; dated Q2 2027. The document

  6. Scaled expected aggregate base-term contract value across the portfolio to approximately $26.6 billion across 949 MW of contracted AI data center capacity, representing more than $1.75 billion of expected average annual NOI, leased or backstopped exclusively by investment-grade counterparties.

    Aug 4, 2026, earnings release; mentions capex, power. The document

  7. $26.6 billion of expected aggregate base-term contract value, more than $1.75 billion of expected average annual NOI, and $7.5 billion of investment-grade project financing secured to date

    Aug 4, 2026, earnings release; mentions capex. The document

  8. Value and NOI Contribution: Cumulative base-term contract value across Hut 8's AI data center portfolio of $26.6 billion, with expected average annual NOI of more than $1.75 billion.

    Jul 20, 2026, press release; mentions contract. The document

Every document of HUT in the corpus: date, channel, kind, document, candidate statements
Sep 28, 2026filings and press releasespress releaseHut 8 Expands Corporate Liquidity with $1.07 Billion Senior Secured0
Aug 4, 2026filings and press releasesearnings releaseHut 8 Reports Second Quarter 2026 Results7
Jul 20, 2026filings and press releasespress releaseHut 8 Fully Commercializes 1 GW Beacon4
Jun 5, 2026filings and press releasespress releaseHut 8 Announces Pricing of $4.25 Billion of Investment-Grade Senior Secured Notes for Beacon Point Data Center Project3
Jun 4, 2026investor presentationsdeckInvestor Presentation1
May 6, 2026filings and press releasesearnings releaseHut 8 Reports First Quarter 2026 Results2
Apr 28, 2026filings and press releasespress releaseHut 8 Announces Pricing of $3.25 Billion of Investment-Grade Senior Secured Notes for River Bend Data Center Project2
Apr 27, 2026investor presentationsdeckHut 8 | River Bend1
Feb 25, 2026filings and press releasesearnings releaseHut 8 Reports Fourth Quarter and Full Year 2025 Results5
Dec 17, 2025investor presentationsdeckDecember 17, 20255
Dec 17, 2025filings and press releasespress releaseHut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus with Total Contract Value of $7.0 Billion2
Nov 17, 2025filings and press releasespress releaseHut 8 Announces Sale of 310 MW Power Portfolio to TransAlta Following Successful Optimization and Long-Term Contract Wins0
Nov 4, 2025filings and press releasesearnings releaseHut 8 Reports Third Quarter 2025 Results1

A candidate statement is one sentence of 40 to 700 characters that contains a forward-looking word (expect, target, plan, on track, will reach, by year-end and the like) and either a quantity with a unit (EH/s, MW, J/TH, BTC, dollars, percent) or a dated target (a quarter, a half, a month or a year). Safe-harbor boilerplate is dropped by its own words. The rule is mechanical: it does not read what a sentence projects, which the research pass behind the guidance ledger does; a document contributes at most 60 candidates, in document order. Every company's corpus.

Other metrics

Definitions

Filed and calculated figures for matching periods. Open a calculation for its arithmetic and sources. Cash flow covers the stated period, not trailing 12 months.

Filed and calculated metrics with their periods and sources
Latest value
-$206.3Mperiod ended Jun 30, 2026Form 10-Q Aug 4, 2026
-1.27period ended Jun 30, 2026Form 10-Q Aug 4, 2026
$8.22Bas of Jun 30, 2026Form 10-Q Aug 4, 2026
$1.44Bas of Jun 30, 2026Form 10-Q Aug 4, 2026
$235.6M652 days oldas of Dec 31, 2024Form 10-K Mar 3, 2025
$66.2M1110 days oldas of Sep 30, 2023Form 10-Q Dec 19, 2023
$26.9Mperiod ended Jun 30, 2026Form 10-Q Aug 4, 2026
$39.7Mperiod ended Jun 30, 2026Form 10-Q Aug 4, 2026
$76.1Mperiod ended Jun 30, 2026Form 10-Q Aug 4, 2026
-$32.8Mperiod ended Jun 30, 2026Form 10-Q Aug 4, 2026
Not taggednonenone
$1.75Bas of Dec 31, 2025Form 10-K Feb 25, 2026
-$31.5MQuarter: Apr 1, 2026 to Jun 30, 2026Form 10-Q Aug 4, 2026
-$635.1MHalf-year: Jan 1, 2026 to Jun 30, 2026Form 10-Q Aug 4, 2026
$7.64BHalf-year: Jan 1, 2026 to Jun 30, 2026Form 10-Q Aug 4, 2026
Cash flow after property and equipment purchases
Why unavailable

Purchases of property and equipment is not tagged in the same filing, USD currency and exact period (Jan 1, 2026 to Jun 30, 2026) as cash from operations.

Not derivablenonenone
Operating margin
Calculation and inputs

Operating income (loss) -206,330,000 USD / revenue 74,932,000 USD x 100 = -275.36%; same filing and period Apr 1, 2026 to Jun 30, 2026.

Operating income (loss): -$206.3Mus-gaap:OperatingIncomeLoss

Revenue: $74.9Mus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax

-275.4%derivedQuarter: Apr 1, 2026 to Jun 30, 2026Form 10-Q Aug 4, 2026
Net margin
Calculation and inputs

Net income (loss) -150,191,000 USD / revenue 74,932,000 USD x 100 = -200.44%; same filing and period Apr 1, 2026 to Jun 30, 2026.

Net income (loss): -$150.2Mus-gaap:NetIncomeLoss

Revenue: $74.9Mus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax

-200.4%derivedQuarter: Apr 1, 2026 to Jun 30, 2026Form 10-Q Aug 4, 2026

The last 22 of 260 filings on EDGAR, grouped into 15 events.

The last 22 of 260 filings on EDGAR: filed, form, document, period
Sep 30, 2026Form 4Form 4, Sep 30, 2026Sep 29, 2026
Sep 30, 2026Schedule 13D/ASchedule 13D/A, Sep 30, 2026none stated
Sep 29, 2026Form 144Form 144, Sep 29, 2026none stated
Sep 28, 2026Form 4Form 4, Sep 28, 2026Sep 24, 2026
Sep 28, 2026Form 8-KForm 8-K, Sep 28, 2026Items 1.01, 2.03, 7.01, 9.01Sep 24, 2026
Sep 24, 2026Form 144Form 144, Sep 24, 2026none stated
Aug 25, 2026Form 4Form 4, Aug 25, 2026Aug 21, 2026
Aug 24, 2026Form 144Form 144, Aug 24, 2026none stated
Aug 4, 2026Form 8-KForm 8-K, Aug 4, 2026Items 2.02, 9.01Aug 4, 2026
Aug 4, 2026Form 10-QForm 10-Q, Aug 4, 2026Jun 30, 2026
Jul 31, 2026Schedule 13GSchedule 13G, Jul 31, 2026none stated
Jul 20, 2026Form 8-KForm 8-K, Jul 20, 2026Items 8.01, 9.01Jul 20, 2026
Jun 18, 2026Form 4Form 4, Jun 18, 2026Jun 17, 2026
Jun 17, 2026Form 144Form 144, Jun 17, 2026none stated
Jun 15, 2026Form 4x8Form 4, Jun 15, 20268 notices filed the same day. The first is linked.Jun 11, 2026

Facilities

Explorer

13 facilities, each linked to its disclosure.

About the locations
Each row says what its coordinates mark: the site itself, a filed address, a power plant, a land parcel, or the centre of the city, county, state or country its filing names.
13 facilities on file: site, location, stage, megawatts energized and nameplate, source
Source
VegaAmarillo (Texas Panhandle), TX (at the centre of its state)operating20520510-K FY2025 filed Feb 25, 2026
Medicine HatMedicine Hat, AB (at the centre of its city)operating676710-K FY2025 filed Feb 25, 2026
Salt CreekOrla, TX (at the centre of its state)operating636310-K FY2025 filed Feb 25, 2026
AlphaNiagara Falls, NY (at a street address that the Census geocoder puts along the road; the buildings can be some distance away)operating505010-K FY2025 filed Feb 25, 2026
DrumhellerDrumheller, AB (at the centre of its city)operating424210-Q Q2 2026 filed Aug 4, 2026
King MountainMcCamey, TX (at the centre of its city)operating28028010-Q Q2 2026 filed Aug 4, 2026
River BendSt. Francisville (West Feliciana Parish), LA (at the centre of its state)under constructionnot disclosed3308-K EX-99.1 Dec 17, 2025
Beacon PointNueces County (near Corpus Christi; city not stated), TX (at the centre of its state)under constructionnot disclosed1,0008-K EX-99.1 Jul 20, 2026
Site 04 (Batavia, Illinois)Batavia, IL (at the centre of its city)announcednot disclosed5010-K FY2025 filed Feb 25, 2026
Site 03 (Texas, location TBD)TX (at the centre of its state)announcednot disclosed18010-K FY2025 filed Feb 25, 2026
Cloud and colocation data centers (Kelowna BC 1.1 MW; Mississauga ON 0.9 MW; Vaughan ON 0.6 MW; Vancouver II 0.5 MW; Vancouver I 0.3 MW)Kelowna / Toronto / Vancouver, BC and ON (at the centre of its country)operating3.43.410-K FY2025 filed Feb 25, 2026
Far North power portfolio (Iroquois Falls 120 MW, Kingston 120 MW, North Bay 35 MW, Kapuskasing ~35 MW)Ontario (four towns), ON (at the centre of its state)sold03108-K EX-99.1 Nov 17, 2025
Kearney, Nebraska and Granbury, Texas (former hosted ASIC operations)Kearney / Granbury, NE / TX (at the centre of its country)terminated0not disclosed10-K FY2025 filed Feb 25, 2026
Megawatts by site, on one scale (the longest bar is 1,000 MW). Solid is energized, outlined is nameplate. A schematic of filed figures only: it shows no buildings, layout or land area.

ERCOT grid prices

The ERCOT price file was last updated Oct 14, 2026, 7 days ago, so no price is shown.

Sites in the ERCOT grid, by county on file

Nueces County (1), Reeves/Culberson (not stated in filing) (1), county not stated (3). No price is tied to a county or a site: a site's load zone is not assigned here.

A zone price is not what any one site pays. Miners may buy at a resource node, under a fixed-price contract, with a hedge or with curtailment credits.

Zone price, not this site's cost. Source: ERCOT, public settlement point prices, as of Oct 14, 2026. ERCOT does not guarantee the accuracy of any such compilations, charts, or analyses. ERCOT terms of use.

Method and licence

Prices are ERCOT's public 15-minute settlement point prices (report 12301), in dollars per megawatt-hour, in ERCOT local time. Daily figures are means, lows and highs of the quarter-hour prices, for days with every reading.

ERCOT's terms allow raw public data to be redistributed in compilations, charts and analyses. We show daily means, lows and highs and the latest price, not ERCOT's files.

Scroll through history

Dated events from Hut 8 Corp.'s own filings and disclosures, each linked to its source, showing at most 14 events and keeping the most recent deals and facility dates (every facility is in the table above). Bitcoin halvings appear from the year its record begins.

Hut 8 logo
  1. Energized: Alpha Niagara Falls, NY

    Source: Hut 8 Corp S-4
  2. Energized: King Mountain McCamey, TX

    Source: Hut 8 Corp S-4/A
  3. Earliest SEC filing on file A 425 form, the first filing under this company's EDGAR record that this site holds.

    Source: 425 on EDGAR
  4. Announced: Alpha Niagara Falls, NY

    Source: Hut 8 Mining 425 Feb 7, 2023
  5. Announced: Far North power portfolio (Iroquois Falls 120 MW, Kingston 120 MW, North Bay 35 MW, Kapuskasing ~35 MW) Ontario (four towns), ON

    Source: Hut 8 Mining 6-K EX-99.1 Nov 3, 2023
  6. Announced: Salt Creek Orla, TX

    Source: Hut 8 press release on hut8.com, posted Jan 5, 2024
  7. Energized: Salt Creek Orla, TX

    Source: Hut 8 10-K FY2024, filed Mar 3, 2025
  8. Bitcoin's fourth halving The reward for each block mined was cut in half, for every miner at once.

    Source: Block on mempool.space
  9. Announced: Vega Amarillo (Texas Panhandle), TX

    Source: Hut 8 press release on hut8.com, posted Jul 9, 2024
  10. Announced: River Bend St. Francisville (West Feliciana Parish), LA

    Source: Hut 8 8-K EX-99.1 Mar 3, 2025
  11. Energized: Vega Amarillo (Texas Panhandle), TX

    Source: Hut 8 10-K FY2025, filed Feb 25, 2026
  12. Fluidstack Ltd. (tenant), lease payments backstopped by Google (Alphabet subsidiary); strategic partnership with Anthropic PBC: contracted River Bend, West Feliciana Parish (St. Francisville), Louisiana

    Source: 8-K EX-99.1 Dec 17, 2025
  13. Fluidstack (ROFO) / Anthropic (joint diligence and development): announced intention River Bend expansion phases, Louisiana

    Source: 10-K FY2025 filed Feb 25, 2026
  14. Same undisclosed high-investment-grade tenant as Phase 1: contracted Beacon Point Phase 2, Nueces County, Texas

    Source: 8-K EX-99.1 Jul 20, 2026