Deals. $119B of disclosed HPC and AI contract value, announced by 11 of the 18 miners in the 18 months to Sep 29, 2026.
Deal value by company
Live HPC and AI agreements, last 18 months. As of Sep 29, 2026. 2 newer filings are waiting to be read.
Method and sources
HUT has the most, $26.6B of the $119B that 11 companies disclose.
MARA has only announced plans.
Checked and found to have none (5): KEEL,
ARBK,
VIP,
DRK, BGDE.
BTBT has no agreement in its own name, but WhiteFiber, which it consolidates, holds agreements, so it is not counted as having none.
- Covers
- live agreements announced from Mar 29, 2025 to Sep 29, 2026 that state a value
- Unit
- US dollars, the contract value each agreement states
Source: The deal book
| Company | Disclosed value (US dollars, the contract value each agreement states) |
|---|---|
| HUT, 1st of 11 by disclosed value, an order by size, not a rating | $26.6B |
| WULF, 2nd of 11 by disclosed value, an order by size, not a rating | $22.7B |
| CIFR, 3rd of 11 by disclosed value, an order by size, not a rating | $16.5B |
| IREN, 4th of 11 by disclosed value, an order by size, not a rating | $15.9B |
| CORZ, 5th of 11 by disclosed value, an order by size, not a rating | $14B |
| RIOT, 6th of 11 by disclosed value, an order by size, not a rating | $9.4B |
| CLSK, 7th of 11 by disclosed value, an order by size, not a rating | $6.6B |
| BTDR, 8th of 11 by disclosed value, an order by size, not a rating | $5.5B |
| DGXX, 9th of 11 by disclosed value, an order by size, not a rating | $1.1B |
| HIVE, 10th of 11 by disclosed value, an order by size, not a rating | $600M |
| DMGGF, 11th of 11 by disclosed value, an order by size, not a rating | $670K |
Contracted capacity
How it is totalledContracted or operating critical IT capacity, for the 10 companies the deal book totals.
What the totals cover
Megawatts on every contracted or operating row in the book, as the deal book totals them. An announced intention, a letter of intent and an agreement sold or terminated are all excluded, and gross site megawatts are a different denominator and are not added in. These totals are not restricted to the 18-month window the figures above use: they include the anchor contracts announced before it, which is why CORZ reads 1,120 MW here against 530 MW on its in-window rows and WULF reads 621 MW here against 561 MW on its in-window rows. The other 8 are the same figure either way. The roll-up covers 10 of the 11 companies with a signed or operating row. DMGGF is absent from it, because no contracted or operating row of its own states a critical IT megawatt figure, so there is nothing to total. This page does not sum them, because a total the research pass did not compute is a second method with the same label.
Deals by date announced
Every deal in the book, with its value where one is stated. As of Sep 29, 2026.
Method and sources
28 of 49 rows state a value. The largest is $19B, WULF with Anthropic PBC, on Jul 6, 2026. 20 came after Jun 30, 2026.
Rows that name only a month or a year (2) sit on the last day that period can mean. Agreements sold or ended (1) keep their value on the chart.
- Covers
- 49 dated rows, Dec 2024 to Sep 2026
- Unit
- US dollars, the contract value each deal states
Source: The deal book
| Disclosed | Company | Counterparty | Status | Disclosed value |
|---|---|---|---|---|
| Dec 31, 2024 (the last day the stated period can mean) | CORZ | CoreWeave, Inc. | Operating, before the window | $10B |
| Dec 31, 2024 (the last day the stated period can mean) | WULF | Core42 (G42 subsidiary) | Operating, before the window | $1.1B |
| Aug 14, 2025 | WULF | Fluidstack USA I Inc. (Google LLC backstop) - CB-3 and CB-4 leases ('WULF-1') | Operating | $3.7B |
| Aug 18, 2025 | WULF | Fluidstack USA I Inc. (Google LLC backstop) - CB-5 lease ('WULF-2') | Contracted | not disclosed |
| Sep 19, 2025 | HIVE | Bell Canada (Bell AI Fabric) | Operating | not disclosed |
| Sep 25, 2025 | CIFR | Fluidstack USA II Inc. (Google LLC backstop) - Barber Lake Phase I | Contracted | $3B |
| Oct 28, 2025 | WULF | Fluidstack (Abernathy Joint Venture, FS CS I LLC; Google $1.3B backstop) | Sold | $9.5B |
| Nov 3, 2025 | IREN | Microsoft Corporation | Operating | $9.7B |
| Nov 3, 2025 | CIFR | Amazon Data Services, Inc. (AWS; guaranteed by Amazon.com, Inc.) - Black Pearl | Operating | $5.5B |
| Nov 6, 2025 | IREN | Together AI, Fluidstack, Fireworks AI (Prince George GPU cloud) | Operating | not disclosed |
| Nov 20, 2025 | CIFR | Fluidstack USA II Inc. (Google LLC backstop) - Barber Lake Phase II | Contracted | $830M |
| Dec 17, 2025 | HUT | Fluidstack Ltd. (tenant), lease payments backstopped by Google (Alphabet subsidiary); strategic partnership with Anthropic PBC | Contracted | $7B |
| Dec 17, 2025 | HUT | Fluidstack (ROFO) / Anthropic (joint diligence and development) | Announced intention | not disclosed |
| Jan 7, 2026 | DGXX | Omnis Pleasants LLC (owner of the Pleasants Power Station) | Letter of intent | not disclosed |
| Jan 13, 2026 | HIVE | Paraguay's leading telecommunications operator (joint venture) | Announced intention | not disclosed |
| Jan 16, 2026 | RIOT | Advanced Micro Devices, Inc. (AMD) - initial lease | Operating | $311M |
| Feb 17, 2026 | HIVE | Undisclosed AI cloud customers | Contracted | $30M |
| Feb 26, 2026 | MARA | Starwood Digital Ventures / Starwood Capital Group Global III, L.P. (development partner, not a tenant) | Announced intention | not disclosed |
| Apr 20, 2026 | DGXX | SubQ AI | Contracted | $19.6M |
| Apr 30, 2026 | MARA | Prospective investment-grade AI / Critical IT tenants at Hannibal, OH (Long Ridge campus) - no counterparty signed | Announced intention | not disclosed |
| Apr 30, 2026 | RIOT | Advanced Micro Devices, Inc. (AMD) - 25 MW expansion (AMD Lease Amendment) | Contracted | not disclosed |
| May 5, 2026 | CIFR | Amazon Data Services, Inc. (AWS; guaranteed by Amazon.com, Inc.) - Stingray | Contracted | $2B |
| May 5, 2026 | DGXX | Cerebras Systems | Contracted | $1.1B |
| May 6, 2026 | HUT | Undisclosed 'multi-trillion-dollar market capitalization, high-investment-grade technology company' (rated AA- or higher) | Contracted | $9.8B |
| May 7, 2026 | IREN | NVIDIA | Contracted | $3.4B |
| Jun 1, 2026 | DMGGF | Undisclosed prospective tenant (confidential under NDA) | Letter of intent | not disclosed |
| Jun 18, 2026 | DMGGF | Undisclosed tenant (AI compute workloads) | Contracted | $670K |
| Jun 22, 2026 | HIVE | Cohere Inc. (contracted through Bell AI Fabric) | Contracted | $220M |
| Jun 25, 2026 | HIVE | Undisclosed 'investment-grade Swedish client' | Letter of intent | not disclosed |
| Jul 6, 2026 | WULF | Anthropic PBC | Contracted | $19B |
| Jul 14, 2026 | CLSK | Anviran, LLC, a wholly owned subsidiary of Meta, which guarantees the rent and operating expenses | Contracted | $6.6B |
| Jul 14, 2026 | CLSK | The Sandersville tenant, Anviran, LLC, a wholly owned subsidiary of Meta (letter of intent and exclusivity) | Letter of intent | not disclosed |
| Jul 20, 2026 | HUT | Same undisclosed high-investment-grade tenant as Phase 1 | Contracted | $9.8B |
| Jul 20, 2026 | IREN | Undisclosed leading AI developers (customer base includes Perplexity, Figure AI, Together AI, Fluidstack, Fireworks AI, Fal AI, Hume AI) | Contracted | $2.8B |
| Jul 21, 2026 | BTDR | AI Cloud GPU customers (not named) - operating platform | Operating | not disclosed |
| Jul 21, 2026 | BTDR | Landlord not named - A201 Johor Bahru, Malaysia (Bitdeer as tenant) | Announced intention | not disclosed |
| Jul 28, 2026 | CORZ | Advanced Micro Devices, Inc. (AMD) | Contracted | $14B |
| Jul 28, 2026 | CORZ | AMD expansion opportunity | Announced intention | not disclosed |
| Aug 4, 2026 | BTDR | Volta Tydal AS (subsidiary of Volta, an NVIDIA Cloud Partner); end customer 'a leading AI lab'; Dell Technologies as technology provider | Contracted | $4.7B |
| Aug 10, 2026 | RIOT | Undisclosed 'leading frontier AI lab' (Tenant Lease) | Contracted | $9.1B |
| Aug 10, 2026 | RIOT | Undisclosed single tenant - Corsicana full campus | Letter of intent | not disclosed |
| Aug 17, 2026 | HIVE | Undisclosed 'investment-grade enterprise customer' | Contracted | $350M |
| Aug 26, 2026 | BTDR | AI Cloud offtake customers (not named) - A102 Cyberjaya, Malaysia | Contracted | $800M |
| Aug 27, 2026 | IREN | Undisclosed leading frontier AI lab | Contracted | not disclosed |
| Aug 27, 2026 | IREN | Mackenzie air-cooled expansion (customers not named) | Announced intention | not disclosed |
| Sep 16, 2026 | BTDR | Provider not named - A202, Johor campus, Malaysia (Bitdeer AI as the customer) | Announced intention | not disclosed |
| Sep 16, 2026 | BTDR | Not named (non-binding letter of intent to develop an AI data center) | Letter of intent | not disclosed |
| Sep 16, 2026 | HIVE | ProCogia (Vancouver applied-AI and data engineering company) | Announced intention | not disclosed |
| Sep 25, 2026 | CIFR | Undisclosed 'leading AI lab' (binding commitment to a ten-year lease that follows the Fluidstack lease) | Contracted | $5.2B |
Anthropic PBCJustified Data Campus, Hawesville, KY (MISO) | Contracted | Jul 6, 2026 | 8-K EX-99.1 Jul 6, 2026no 2nd source | ||||
Advanced Micro Devices, Inc. (AMD)Pecos TX ~185 MW, Dalton GA ~120 MW, Hunt County TX ~110 MW, Muskogee OK ~82 MW, Auburn AL ~32 MW | Contracted | Jul 28, 2026 | 8-K EX-99.1 Jul 28, 2026, Q2 2026 results releaseno 2nd source | ||||
CoreWeave, Inc.Denton TX ~260 MW, Dalton GA ~175 MW, Muskogee OK ~70 MW, Marble NC ~65 MW, Austin TX ~20 MW | Operating | 2024(first HDC contract), expanded to about 590 MW; 70 MW expansion later | |||||
Undisclosed 'multi-trillion-dollar market capitalization, high-investment-grade technology company' (rated AA- or higher)Beacon Point Phase 1, Nueces County, Texas | Contracted | 2026-Q1exact date not disclosed; first disclosed in the Q1 2026 10-Q and release of May 6, 2026 | 10-Q Q1 2026 filed May 6, 2026one party | ||||
Same undisclosed high-investment-grade tenant as Phase 1Beacon Point Phase 2, Nueces County, Texas | Contracted | Jul 20, 2026 | 8-K EX-99.1 Jul 20, 2026one party | ||||
Microsoft CorporationChildress, TX (Horizon 1-4, four 50MW IT liquid-cooled data centers) | Operating | Nov 3, 2025 | 8-K EX-99.1 Nov 3, 2025no 2nd source | ||||
Fluidstack (Abernathy Joint Venture, FS CS I LLC; Google $1.3B backstop)Abernathy, TX (SPP) | Sold | Oct 28, 2025 | , sold | , sold | , sold | 8-K EX-99.1 Oct 28, 2025no 2nd source | |
RIOT | Undisclosed 'leading frontier AI lab' (Tenant Lease)Rockdale, TX (build-to-suit Tier 3) | Contracted | Aug 10, 2026 | 8-K EX-99.1 Aug 10, 2026one party | |||
Fluidstack Ltd. (tenant), lease payments backstopped by Google (Alphabet subsidiary); strategic partnership with Anthropic PBCRiver Bend, West Feliciana Parish (St. Francisville), Louisiana | Contracted | Dec 17, 2025 | 8-K EX-99.1 Dec 17, 2025no 2nd source | ||||
Anviran, LLC, a wholly owned subsidiary of Meta, which guarantees the rent and operating expensesSandersville AI Campus, Sandersville (Washington County), Georgia | Contracted | Jul 14, 2026 | 8-K Jul 14, 2026 Item 8.01 and EX-99.1no 2nd source | ||||
Amazon Data Services, Inc. (AWS; guaranteed by Amazon.com, Inc.) - Black PearlBlack Pearl, Wink, TX | Operating | Nov 3, 2025 | 8-K EX-99.1 Feb 3, 2026no 2nd source | ||||
Undisclosed 'leading AI lab' (binding commitment to a ten-year lease that follows the Fluidstack lease)Barber Lake, near Colorado City, TX | Contracted | Sep 25, 2026 | not stated | 8-K EX-99.1 Sep 25, 2026one party | |||
Volta Tydal AS (subsidiary of Volta, an NVIDIA Cloud Partner); end customer 'a leading AI lab'; Dell Technologies as technology providerTydal, Norway | Contracted | Aug 4, 2026 | 6-K EX-99.1 Aug 5, 2026no 2nd source | ||||
Fluidstack USA I Inc. (Google LLC backstop) - CB-3 and CB-4 leases ('WULF-1')Lake Mariner (CB-3 42 MW delivered July 2026; CB-4 168 MW under construction, phased H2 2026) | Operating | Aug 14, 2025 | 8-K EX-99.1 Aug 14, 2025no 2nd source | ||||
NVIDIAChildress, TX (60MW of existing air-cooled data centers) | Contracted | May 7, 2026 | 8-K EX-99.1 May 8, 2026no 2nd source | ||||
Fluidstack USA II Inc. (Google LLC backstop) - Barber Lake Phase IBarber Lake, near Colorado City, TX | Contracted | Sep 25, 2025 | 8-K EX-99.1 Sep 25, 2025no 2nd source | ||||
Undisclosed leading AI developers (customer base includes Perplexity, Figure AI, Together AI, Fluidstack, Fireworks AI, Fal AI, Hume AI)Childress, TX and British Columbia (air-cooled GPU deployments) | Contracted | Jul 20, 2026 | not stated | not stated | 8-K EX-99.1 Jul 20, 2026one party | ||
Amazon Data Services, Inc. (AWS; guaranteed by Amazon.com, Inc.) - StingrayStingray, Andrews, TX | Contracted | May 5, 2026 | 8-K EX-99.1 Jun 8, 2026no 2nd source | ||||
DGXX | Cerebras SystemsColumbiana, Alabama (40 MW purpose-built campus) | Contracted | May 5, 2026filed May 8, 2026 | 8-K EX-99.1 filed May 8, 2026no 2nd source | |||
Core42 (G42 subsidiary)Lake Mariner (WULF Den 2 MW, CB-1 16 MW, CB-2A/CB-2B 42 MW) | Operating | 2024-12 | 8-K EX-99.1 Nov 10, 2025no 2nd source | ||||
Fluidstack USA II Inc. (Google LLC backstop) - Barber Lake Phase IIBarber Lake, near Colorado City, TX | Contracted | Nov 20, 2025 | 8-K EX-99.1 Nov 20, 2025no 2nd source | ||||
AI Cloud offtake customers (not named) - A102 Cyberjaya, MalaysiaA102, Cyberjaya, Malaysia (leased facility, GB300) | Contracted | Aug 26, 2026 | not stated | 6-K EX-99.1 Aug 26, 2026one party | |||
Undisclosed 'investment-grade enterprise customer'Bell AI Fabric facility, Merritt, British Columbia | Contracted | Aug 17, 2026filed Aug 19, 2026 | not stated | 8-K EX-99.1 filed Aug 19, 2026one party | |||
RIOT | Advanced Micro Devices, Inc. (AMD) - initial leaseRockdale, TX (Building G retrofit) | Operating | Jan 16, 2026 | 8-K EX-99.1 Jan 16, 2026no 2nd source | |||
Cohere Inc. (contracted through Bell AI Fabric)Bell AI Fabric, Canada | Contracted | Jun 22, 2026 | not stated | ||||
Undisclosed AI cloud customersBell AI Fabric data centre, Manitoba | Contracted | Feb 17, 2026 | not stated | 8-K EX-99.1 Feb 17, 2026one party | |||
DGXX | SubQ AINeoCloudz GPU-as-a-Service platform (Digi Power X sites) | Contracted | Apr 20, 2026 | not stated | 8-K EX-99.1 Apr 20, 2026no 2nd source | ||
DMGGF | Undisclosed tenant (AI compute workloads)Christina Lake prefabricated data centres (PDCs), British Columbia | Contracted | Jun 18, 2026 | not stated | DMG news release Jun 18, 2026one party | ||
ProCogia (Vancouver applied-AI and data engineering company)BUZZ HPC's Canadian data centres | Announced intention | Sep 16, 2026filed Sep 17, 2026 | not stated | not stated | not disclosed | 8-K EX-99.1 filed Sep 17, 2026no 2nd source | |
Provider not named - A202, Johor campus, Malaysia (Bitdeer AI as the customer)A202, Johor campus, Malaysia | Announced intention | Sep 16, 2026 | , announced intention | , announced intention | not disclosed | 6-K EX-99.1 Sep 16, 2026one party | |
Not named (non-binding letter of intent to develop an AI data center)Gelephu Mindfulness City, Bhutan | Letter of intent | Sep 16, 2026 | , letter of intent | not stated | not disclosed | 6-K EX-99.1 Sep 16, 2026one party | |
Undisclosed leading frontier AI labnot disclosed | Contracted | Aug 27, 2026 | not stated | not stated | not disclosed | 8-K EX-99.1 Aug 27, 2026one party | |
Mackenzie air-cooled expansion (customers not named)Mackenzie, BC | Announced intention | Aug 27, 2026 | , announced intention | not stated | not disclosed | 8-K EX-99.1 Aug 27, 2026one party | |
RIOT | Undisclosed single tenant - Corsicana full campusCorsicana (Navarro County), TX | Letter of intent | Aug 10, 2026 | , letter of intent | not stated | not disclosed | 8-K Aug 10, 2026one party |
AMD expansion opportunityPecos TX ~815 MW, Muskogee OK ~725 MW, Hunt TX ~192 MW, Muskogee ~192 MW (grid power in load study and behind-the-meter) | Announced intention | Jul 28, 2026 | , announced intention | not stated | not disclosed | 8-K EX-99.1 Jul 28, 2026no 2nd source | |
AI Cloud GPU customers (not named) - operating platformA101 Cyberjaya, Malaysia (2.5 IT MW live) and other GPU deployments | Operating | Jul 21, 2026 | not disclosed | 6-K EX-99.1 Jul 21, 2026one party | |||
Landlord not named - A201 Johor Bahru, Malaysia (Bitdeer as tenant)A201, Johor Bahru, Malaysia | Announced intention | Jul 21, 2026 | , announced intention | , announced intention | not disclosed | 6-K EX-99.1 Aug 26, 2026one party | |
The Sandersville tenant, Anviran, LLC, a wholly owned subsidiary of Meta (letter of intent and exclusivity)Texas portfolio: Sealy campus (Austin County) and Brazoria campus (Brazoria County) | Letter of intent | Jul 14, 2026 | , letter of intent | not stated | not disclosed | 8-K EX-99.1 Jul 14, 2026no 2nd source | |
Undisclosed 'investment-grade Swedish client'Big Boden, Sweden (32 MW site) | Letter of intent | Jun 25, 2026 | , letter of intent | , letter of intent | not disclosed | 8-K EX-99.1 Jun 25, 2026one party | |
DMGGF | Undisclosed prospective tenant (confidential under NDA)Christina Lake, British Columbia | Letter of intent | Jun 1, 2026 | , letter of intent | , letter of intent | not disclosed | DMG news release Jun 1, 2026one party |
RIOT | Advanced Micro Devices, Inc. (AMD) - 25 MW expansion (AMD Lease Amendment)Rockdale, TX | Contracted | Apr 30, 2026 | not disclosed | 10-Q Q2 2026no 2nd source | ||
MARA | Prospective investment-grade AI / Critical IT tenants at Hannibal, OH (Long Ridge campus) - no counterparty signedHannibal, OH (Long Ridge Energy campus, pending acquisition) | Announced intention | Apr 30, 2026 | , announced intention | not stated | not disclosed | 8-K EX-99.1 Apr 30, 2026one party |
MARA | Starwood Digital Ventures / Starwood Capital Group Global III, L.P. (development partner, not a tenant)All US MARA-owned bitcoin mining properties other than those in existing third-party JVs; Matagorda County to be developed through the same partnership | Announced intention | Feb 26, 2026 | not stated | not stated | not disclosed | 8-K Feb 26, 2026 Item 1.01no 2nd source |
Paraguay's leading telecommunications operator (joint venture)Asuncion, Paraguay (Tier III facility of the telecom operator) | Announced intention | Jan 13, 2026 | not stated | not stated | not disclosed | 8-K EX-99.1 Jan 13, 2026no 2nd source | |
DGXX | Omnis Pleasants LLC (owner of the Pleasants Power Station)Pleasants Power Station, West Virginia | Letter of intent | Jan 7, 2026 | , letter of intent | not stated | not disclosed | 8-K EX-99.1 Jan 7, 2026no 2nd source |
Fluidstack (ROFO) / Anthropic (joint diligence and development)River Bend expansion phases, Louisiana | Announced intention | Dec 17, 2025 | , announced intention | not stated | not disclosed | 10-K FY2025 filed Feb 25, 2026no 2nd source | |
Together AI, Fluidstack, Fireworks AI (Prince George GPU cloud)Prince George, BC | Operating | Nov 6, 2025 | not stated | not disclosed | 8-K EX-99.1 Nov 6, 2025no 2nd source | ||
Bell Canada (Bell AI Fabric)Bell AI Fabric Tier-III data centres, Manitoba and Merritt, British Columbia | Operating | Sep 19, 2025(partnership); first phase operating agreements executed Nov 18, 2025 | not stated | not disclosed | |||
Fluidstack USA I Inc. (Google LLC backstop) - CB-5 lease ('WULF-2')Lake Mariner (CB-5, under construction, phased delivery early 2027) | Contracted | Aug 18, 2025 | not disclosed | 8-K EX-99.1 Aug 18, 2025no 2nd source |
Verified negatives
5 companies were checked and have no HPC or AI agreement: a finding, not a blank. The documents were read, and this is what they say.
No HPC or AI colocation, lease or hosting contract signed, as of Aug 10, 2026.
Active negotiations at three sites with deepening commercial engagement
Keel (formerly Bitfarms) has decommissioned all US bitcoin mining for HPC construction and reports a 2.2 GW pipeline, but the Q2 2026 release describes prospective tenants negotiating, not a signed lease. Adjacent agreements that are not customer deals: a $128.7 million binding purchase commitment for critical IT equipment and building materials for 18 MW gross (November 2025), a $300 million Macquarie credit facility for Panther Creek HPC development (April 2025), a 21 MW third-party ASIC hosting contract at Panther Creek, a partnership with builder T5 Data Centers to advance HPC/AI development at Panther Creek (August 2025), and a Hydro-Sherbrooke agreement for the conditional transfer of 96 MW (August 2026).
No HPC or AI colocation, lease or hosting contract signed, as of Sep 3, 2026.
The Company is actively evaluating opportunities in high-performance computing and artificial-intelligence data center infrastructure.
Argo Blockchain files as a foreign private issuer (20-F). Its only hosting agreements in the window are bitcoin ASIC hosting with Merkle Standard (9,315 miners at Memphis, up to 4,000 in Washington State), which ended in March and April 2026. HPC and AI appear in the 20-F only as competition for power. No 2026 interim 6-K with an HPC contract was found in the corpus checked. Its 6-K of Sep 3, 2026, on the departure of its chief executive, still describes AI and HPC as opportunities it is evaluating.
No HPC or AI colocation, lease or hosting contract signed, as of Sep 10, 2026.
The Company's post-transaction priorities include securing customers for up to 104 MW of near-term capacity at its owned sites, advancing development of those assets progressing approximately 510 MW of additional future capacity and pursuing acquisitions of additional energized assets and powered land.
Vulcan Infrastructure and Power (formerly Greenidge Generation) has a pipeline, not a contract. Watch out for the CoreWeave lease in its August 2026 investor presentation: the 100 MW Lancaster lease to CoreWeave and the 19-year 178 MW triple-net lease are case studies of what its new strategic investors (Machine Investment Group and Atlas) did before investing in Vulcan, not Vulcan contracts. Also in the window: a proposed NYSEG interconnection agreement for 60 MW of non-curtailable power at Dresden (May 2026).
No HPC or AI colocation, lease or hosting contract signed, as of Sep 14, 2026.
The Company has no contracted artificial intelligence or high-performance computing revenue.
Sphere 3D closed its business combination with Cathedra Bitcoin in 2026 and took the name DarkHorse Technologies Inc. on Sep 16, 2026; its shares have traded as DRK since Sep 17, 2026. Its September 2026 investor deck says it has no contracted AI or HPC revenue, and its release of Sep 16, 2026 calls the AI and HPC uses of its sites potential, none of them contracted. After agreeing to sell its Iowa site and its legacy mining fleet it expects about 50 MW across four sites in Tennessee and Kentucky and has proposed a new 50 MW data center at Hopkinsville, Kentucky. Its capacity contracts are co-mining agreements with Bitdeer covering 30 MW, which are bitcoin mining, not AI or HPC.
No HPC or AI colocation, lease or hosting contract signed, as of Sep 24, 2026.
Under the terms of the agreement, Endeavor will purchase and deliver approximately 25,000 mining computers, and Big Digital will provide Endeavor with approximately 75MW of compute capacity.
Big Digital Energy (formerly Mawson Infrastructure) signs colocation agreements, but they are bitcoin ASIC colocation: 9 MW, 20 MW and 64 MW enterprise agreements (September 2025), a related-party 75 MW agreement with the Endeavor Group (April 2026) and a roughly 50 MW framework with Consensus/NYDIG (June 2026). Its AI work in the window is a GPU pilot on a decentralised AI network (October 2025) and an AI colocation plan for the Texas Load House site (July 2026), neither of which is a signed AI customer contract. Its only 8-K since, of Sep 24, 2026, exchanges a credit line owed to Endeavor for shares and names no AI or HPC agreement.
Listed apart: no agreement in its own name, but a consolidated subsidiary holds agreements. This is not a finding that the group has none.
No HPC or AI agreement in its own name is on file: every one it reports was signed by WhiteFiber or a WhiteFiber subsidiary, which Bit Digital consolidates, as of Aug 13, 2026.
In November 2025, WhiteFiber's wholly owned subsidiary, Enovum NC-1 Bidco, LLC, entered into the Services Agreement with Nscale Services US Inc.
Bit Digital's quarterly report for the quarter ended June 30, 2026 stated that it owned about 69.6 percent of WhiteFiber and consolidated it, so this is not a finding that Bit Digital's group has no agreements: WhiteFiber alone reports more than $540 million of new cloud contracts. Bit Digital's Schedule 13D/A with an event date of August 21, 2026 states 59.9 percent of the class. WhiteFiber issued new shares and Bit Digital's own 27,043,750 shares did not change, so the later, lower figure is dilution, not a sale. WhiteFiber is a separate company and the agreements are its own. A WhiteFiber subsidiary signed the Nscale agreement at NC-1. WhiteFiber's own filings describe the Cerebras agreement at MTL-3, the DNA Fund agreement (which WhiteFiber ended in November 2025) and the first customer's GPU agreement. Bit Digital's own release and deck present the 24 MW at NC-1, the $175 million and the $540 million of cloud contracts as WhiteFiber's. None is shown here as Bit Digital's, and nothing is added up for Bit Digital.
How the book was built
MethodologyTier 1 rows come from the first round of the research pass, each read from the primary filing. Tier 2 and Tier 3 rows were found by sweeping 436 EX-99 press releases and decks from the last 12 months plus 185 more fetched for Mar 6, 2025 to Sep 5, 2025, and the 10-K, 10-Q and 20-F on file, for HPC and AI keywords; a language model run on the site's own machine (qwen3.6:35b-a3b) read the text around every match and returned each agreement with one verbatim sentence; a row was kept only if that sentence was found again, word for word, in the document; Claude then verified the numbers against the document and wrote the row. Companies with no such deal get a verified-negative entry with the documents checked and the sentence that shows what they do have instead. The book was refreshed on Sep 25, 2026 from the 8-K and 6-K exhibits and the company news releases published since Sep 6, 2026: each was swept for the same words and read in full, every new or changed row was checked against its document, and each new row carries one sentence found again, word for word, in that document. The book was refreshed on Sep 29, 2026 from the one waiting document, Bitdeer's exhibit of Sep 29, 2026 (EX-99.2, RECENT DEVELOPMENTS), read in full: it names no new HPC or AI customer agreement, and the booked A102 offtake now carries its five-year term in its note, each changed sentence checked against its document.
The research brief asks for the last 18 months; the deal tracker asks for every announced HPC or AI contract. Both are kept: every row says whether it falls inside the 18 months, and rows announced before Mar 29, 2025 (the anchors the story needs, such as Core Scientific and CoreWeave or TeraWulf and Core42) stay in the book, marked outside them.
The research pass's deal book, sha256 f2eb1d856f65, generated Sep 30, 2026, 20:54 -04:00.


DGXX
DMGGF