Skip to the content
MinerTerminal

Ask company statements

Methodology

Ask about a company

Ask a question about captured statements. Answers use a limited snapshot of company targets and guidance, with original quotes attached. Full filings, live news and later outcomes may be missing.

Search original excerpts

Your question is processed for this response, not saved by the answer service. Do not include private account, portfolio or contact information.

169 matching excerpts

Every result contains all of these whole words: power. Newest document dates first. No semantic matching or synonym expansion.

  1. WULF INVESTMENT CASE Power is the primary constraint in AI infrastructure growth WULF controls scalable, power - advantaged sites across key markets Positioned to partner with utilities as interconnection dynamics evolve Long - term, credit - backed contracts drive stable, recurring cash flows Platform supports a target of 250 – 500 MW of annual contracted capacity growth 01 02 03 04 05 Power is the constraint.

    THE POWER OF INFRASTRUCTURE Q2 2026 BUSINESS UPDATE AUGUST 5, 2026 Q2(deck)

  2. Power X Inc. (Nasdaq: DGXX / Cboe Canada: DGX) (the “Company” or “Digi Power X”), an AI data center infrastructure operator, plans to announce its financial results for the second quarter ended June 30, 2026 (the “Second Quarter Results”)

    PRESS RELEASE DATED AUGUST 4, 2026(earnings release)

  3. Strategically located less than 40 miles from Dallas-Forth Worth, the approximately 50-acre site currently has 17 MW of operational power and is expected to support a phased expansion to as much as 111 MW of grid capacity, subject to validation by the Electric Reliability Council of Texas

    PRESS RELEASE DATED JULY 20, 2026(press release)

  4. Ticker change to “VIP” reflects the Company’s rebrand to Vulcan Infrastructure and Power; shares expected to begin trading on Nasdaq under the new symbol on or about July 24, 2026

    Greenidge Generation Announces $39.4 Million(press release)

  5. In connection with the transaction, the tenant has also executed a letter of intent and exclusivity arrangement covering CleanSpark’s entire Texas portfolio of 718 acres with up to 885 MW of secured and planned power capacity, positioning Sandersville as the first chapter of a substantially larger relationship.

    CleanSpark Secures Twenty-Year Lease with High-Investment Grade Global Technology Company for Data Center in Sandersville, Georgia(press release)

  6. The Texas portfolio totals 718 acres with up to 885 MW of secured and planned power capacity, including 271 acres with nearly 300 MW at our Sealy campus and 447 acres at the Brazoria campus, where transmission-level infrastructure supports an initial 300 MW demand load with the potential to expand to 600 MW.

    CleanSpark Secures Twenty-Year Lease with High-Investment Grade Global Technology Company for Data Center in Sandersville, Georgia(press release)

  7. Upon full energization, the site is expected to more than double MARA's potential power capacity to approximately 4.8 GW across its portfolio

    Signs Agreement with HIF to Acquire Strategic Powered Land Site in Texas(press release)

  8. For fiscal 2027, Digi Power X is targeting an annualized run rate of approximately $250–$300 million across its three operating segments:

    PRESS RELEASE DATED JULY 7, 2026(press release)

  9. 50/50 joint venture targets a phased buildout of up to 311 MW on a site with live power and grid headroom

    PRESS RELEASE, DATED JULY 6, 2026(press release)

  10. S I T E & R E A L E S TAT E Location Dallas–Fort Worth area, TX (ERCOT) Interconnection 138 kV transmission (ERCOT) Site size ~50 acres Improvements 30,000 sq ft bldg · 10-tonne crane Also on site 2 warehouses · office · 2 water wells P O W E R & E N E R G Y Power today 17 MW operational Year-1 target 74 MW (grid) Energization Near-term Potential headroom 111.6 MW Gas access 2 × 12″ + 1 × 24″ lines on-site · in service Full-deployment target Up to 300+ MW (all tracks) W H Y P O W E R - R E A D Y W I N S Greenfield datacenter sites wait years in ERCOT interconnection queues before energizing a single server.

    INVESTOR PRESENTATION MATERIALS, DATED JULY 6, 2026(deck)

  11. The Hood County site already carries 17 MW of operational power and will be expandable up to 111 MW of grid power, subject to validation by the Electric Reliability Council of Texas (“ERCOT”).

    PRESS RELEASE, DATED JULY 6, 2026(press release)

  12. The Opportunity: AI Infrastructure Supercycle 3x Revenue per MW from AI contracts vs BTC mining $330 PJM capacity price per MW - day (up from $30) grid power is scarce 85% Project EBITDA margins on AI/HPC colocation vs. ~30% for mining $5.2T AI data center infrastructure investment needed by 2030 130 GW Projected data center power demand by 2028 — up from ~20 GW $70B+ AI hosting contracts announced by former BTC miners through Q1 2026 Sources: McKinsey, CoinShares Q1 2026, JPMorgan, PJM Interconnection.

    COMPANY PRESENTATION DATED JUNE 2026(deck)

  13. The Transaction is expected to deliver greater scale and an expanded US operating footprint, with the Combined Company owning and operating a portfolio of 53 megawatts ("MW") of power capacity across five data centers in Iowa, Kentucky, and Tennessee.

    Sphere 3D and Cathedra Bitcoin Announce Closing of Business Combination(press release)

  14. At closing, the combined company will operate over 50 megawatts of energized power infrastructure across a multi-region portfolio spanning the Tennessee Valley Authority service territory in Tennessee and Kentucky, within proximity to both the Nashville and Knoxville metropolitan areas, and an operating site in Iowa.

    Sphere 3D Receives Shareholder Approval Related to Cathedra(press release)

  15. HIVE now has over 850 MW of power globally; this includes our 450 MW of operating data centers plus a pipeline of 400 MW of capacity, which we expect to bring online in 2027.

    HIVE DIGITAL TECHNOLOGIES LTD.(press release)

  16. •Submitted a request to the Tennessee Valley Authority for 250MW of additional power at the Company’s Mississippi greenfield site, which would supplement the 40MW load that the Company anticipates being energized in Q1 2027;

    Greenidge Generation Reports First Quarter 2026 Results and Advances AI/HPC Infrastructure Expansion(earnings release)

  17. •Received a proposed Interconnection Agreement from NYSEG for the previously announced 60MW of non-curtailable power at the Dresden facility, which, if entered into, is expected to advance the Company’s AI/HPC datacenter development plans;

    Greenidge Generation Reports First Quarter 2026 Results and Advances AI/HPC Infrastructure Expansion(earnings release)

  18. In March 2026, the Company announced a definitive agreement to combine with Cathedra Bitcoin, Inc. The proposed combination is intended to create a scaled digital infrastructure platform anchored in a central market reality: as demand for compute capacity continues to expand, access to scalable, efficiently managed power is becoming increasingly valuable.

    Sphere 3D Reports First Quarter 2026 Financial Results(earnings release)

  19. Forward-looking information in this news release includes the statements under “2027 Outlook” and other statements regarding goals, expectations and targets for the business of Digi Power X, including through USDC.

    MATERIAL CHANGE REPORT DATED MAY 15, 2026(earnings release)

  20. For fiscal 2027, Digi Power X is targeting total revenue of approximately $250-$300 million across its three operating segments:

    MATERIAL CHANGE REPORT DATED MAY 15, 2026(earnings release)

What this search can find

Snapshot 2026-09-23. The corpus lists 577 documents; 426 have captured text. Search includes 1329 source-linked excerpts across the indexed companies, within 2025-09-22 to 2026-09-23.

The existing extraction rule selects sentences with a forward-looking word and a quantity or dated target, with at most sixty candidates per document. It drops safe-harbor boilerplate. This is not full-text search of every SEC filing, a transcript archive, live news, or an assessment of whether management delivered.

Only excerpts joined to a captured document with a source fingerprint are searchable. Social posts and interviews are not captured. A missing result is a coverage limit, not an answer. Open the guidance ledger for researched promises and outcomes; open filings for the filing index.