Ask company statements
MethodologyAsk about a company
Ask a question about captured statements. Answers use a limited snapshot of company targets and guidance, with original quotes attached. Full filings, live news and later outcomes may be missing.
Find original excerpts
Search words in captured statements and document titles. Results are original excerpts, not generated answers. Use the source document to check context and whether a target was later changed.
169 matching excerpts
Every result contains all of these whole words: power. Newest document dates first. No semantic matching or synonym expansion.
Following its business combination with Cathedra Bitcoin and upon completion of the previously announced sale of its Iowa site, the Company expects to own and/or operate approximately 50 MW of operating power capacity across four data center locations in Tennessee and Kentucky, and has a proposed new 50 MW data center under development in Kentucky, together with a development pipeline of approximately 100 MW of additional potential expansion opportunities.
PRESS RELEASE DATED SEPTEMBER 16, 2026(press release)
30 MW of capacity and the potential 500 MW expansion pathway contemplated by the non-binding letter of intent in Bhutan; the Company’s expectations regarding additional power allocations at its Rockdale site; the expected deployment of GPU hardware at the A201 facility;
PRESS RELEASE - BITDEER ANNOUNCES AUGUST 2026 PRODUCTION AND OPERATIONS UPDATE(production update)
ASIC hosting MINERS PAY FOR POWER + UPTIME ~$0.4M / MW-YR · THE BASELINE Bitcoin self-mining SELF-MINING MACHINES, SELF MARGIN ~$0.5–1M / MW-YR · ~2X · RIDES HASHPRICE AI powered shell LEASED TO A COMPUTE OPERATOR ~$1.6–2.4M / MW-YR · 4–6X · $130–200/KW-MO IT AI factory · GPU compute COMPUTE SOLD BY THE HOUR ~$7–15M / MW-YR · 20X+ Illustrative industry ranges at sustained utilization · not guidance · bar scale compressed for legibility · figures: finance / IR to lock 1 Implies ~$1.33–$2.85 / GPU-HR (~750 GPUs/MW IT · 80% utilization) INVESTOR PRESENTATION / SEPTEMBER 2026 20 1
Site data per company disclosures (darkhorse.inc / DarkHorse.com), Aug 2026. * Total site power includes planned capacity for Blackjack and Truckstop.
APPENDIX / SITE CONCEPT Truckstop 50 MW total site power (planned) Two-story building concept with battery storage.
Fastest Growing Data Center Markets in the US 64% of new US data-center construction is in secondary/frontier markets 18% data centers as a share of TVA industrial load in 2025, projected to double by 2030 4–7 yrs typical U.S. grid-interconnection queue in core markets, energized TVA sites skip the line WHY WE BELIEVE SMALL & ENERGIZED WINS Inference is atomizable & latency-sensitive, favors regional 10–15 MW sites. DarkHorse's TVA power is live today, not stuck in a 4 to 7 year interconnection queue.
Demand For Power Continues to Accelerate Source: Morgan Stanley Research Estimates for GOOGL, AMZN, META, MSFT, and ORCL Hyperscaler Capex Growth Projections $261B $449B $805B $1,116B 2024A 2025A 2026E 2027E Hyperscaler Demand Rapidly Outgrowing Power Supply Global DC capacity demand 82 GW → 219 GW by 2030 (McKinsey). AI is ~70% of 2030 data-center demand. AI token volume compounding alongside the power capacity ramp, Google +20× YoY.
APPENDIX / SITE CONCEPT Blackjack 30 MW total site power (planned) Modular conversion concept with battery storage.
TRUCKSTOP 50 MW total site power (planned) A 50 MW pipeline project, anchored by a new substation DarkHorse pays for.
SEPTEMBER 2026 BLACKJACK 30 MW total (planned) ROCKWOOD 10 MW total BRICKYARD 15 MW total TRUCKSTOP 50 MW total (planned) ILLUSTRATIVE SITE CONCEPTS / TOTAL SITE POWER 01
Blackjack 30 MW Total site power (planned) Modular conversion with battery storage Rockwood 10 MW Total site power Modular conversion with battery storage Brickyard 15 MW Total site power Modular conversion with battery storage Truckstop 50 MW Total site power (planned) Building concept with battery storage AI-generated concept renderings.
Vulcan intends to use the net proceeds primarily to redeem the remaining approximately $33.1 million aggregate principal amount of its 8.50% Senior Notes due October 2026, with remaining proceeds available for general corporate purposes, including predevelopment activities at the Company’s operations in Dresden, New
Vulcan Infrastructure and Power Completes $39.4 Million Strategic Investment(press release)
Vulcan currently operates a 104 MW power plant in Dresden, New York and owns a 34-acre development site in Columbus, Mississippi, where 40 MW is expected to become available by the third quarter of 2027.
Vulcan Infrastructure and Power Completes $39.4 Million Strategic Investment(press release)
• Expanding Power Capacity and Capital Allocation Flexibility: HIVE currently operates approximately 440 MW of global power capacity and expects its energized footprint to reach approximately 540 MW following the planned energization of an additional 100 MW PPA at Yguazú in the fourth quarter of calendar 2026.
HIVE DIGITAL TECHNOLOGIES LTD.(earnings release)
•A 654 MW combined pipeline at Vulcan-owned sites, including more than 100 MW of capacity expected to be available for AI/HPC opportunities within the next year;
•The anticipated strengthening of Vulcan’s balance sheet following the proposed PIPE transaction and planned redemption of the Senior Notes due October 2026 (the "Senior Notes"); and
The Company is on track to deliver the next approximately 82 MW at Muskogee to its customer beginning in the second half of 2027.
Core Scientific Completes Acquisition of Polaris DS, Advancing Planned Muskogee Expansion to 1.5 GW of Gross Power MIAMI, Florida, August 14, 2026 – Core Scientific, Inc. (Nasdaq: CORZ) (“Core Scientific” or the “Company”), a leader in digital infrastructure for high-density colocation (“HDC”), today announced that it has completed its previously announced acquisition of Polaris DS LLC (“Polaris”).
Core Scientific reiterates its plan to scale its Muskogee campus to approximately 1.5 GW of gross power, or approximately 1.0 GW of leasable power, through a combination of grid-connected and behind-the-meter solutions.
Upon closing, we expect the $39.4 million investment by Atlas Holdings,[1] Machine Investment Group, Conversant Capital and other investors to significantly strengthen our balance sheet, address our near-term debt maturities and provide additional capital to accelerate the development of our power and digital infrastructure platform.
Vulcan Infrastructure and Power Reports Second Quarter 2026 Results(earnings release)
What this search can find
Snapshot 2026-09-23. The corpus lists 577 documents; 426 have captured text. Search includes 1329 source-linked excerpts across the indexed companies, within 2025-09-22 to 2026-09-23.
The existing extraction rule selects sentences with a forward-looking word and a quantity or dated target, with at most sixty candidates per document. It drops safe-harbor boilerplate. This is not full-text search of every SEC filing, a transcript archive, live news, or an assessment of whether management delivered.
Only excerpts joined to a captured document with a source fingerprint are searchable. Social posts and interviews are not captured. A missing result is a coverage limit, not an answer. Open the guidance ledger for researched promises and outcomes; open filings for the filing index.