169 matching excerpts

Every result contains all of these whole words: power. Newest document dates first. No semantic matching or synonym expansion.

  1. Digi Power X anticipates full commissioning of the entire ARMS 200 system with the ability to generate GPU-as-a-Service rental AI income by the beginning of April 2026, with 10 megawatts (“MW”) of pods to be operational at its Alabama facility by Q3 2026.

    MATERIAL CHANGE REPORT DATED MARCH 2, 2026(press release)

  2. Company believes it current liquidity positions it to be able to carry out the rollout of its 2026 AI infrastructure development plan, which includes the planned deployment of high-efficiency Tier 3 AI data centers and expansion of the Company’s power capacity across multiple U.S. sites.

    MATERIAL CHANGE REPORT DATED MARCH 2, 2026(press release)

  3. Pursuant to the terms of the LOI, the parties intend to conduct a comprehensive load and interconnection study of up to 1.3 GW, evaluating long-term power availability and grid connectivity for energy-intensive computing applications.

    MATERIAL CHANGE REPORT DATED MARCH 2, 2026(press release)

  4. 255 – 177 – 0 ➢ Strong state and community support ➢ Recognized economic anchor project for the State 8 Justified Data: The Immediate Power Campus Hawesville, KY | 480 MW Campus in MISO 480 MW IMMEDIATE POWER ACTIVE HYPERSCALER DEMAND LOCAL ALIGNMENT EXPANSION OPTIONALITY ➢ Additional scalable capacity ➢ Grid-powered or on-site gen ➢ Active engagement with major hyperscalers ➢ Data room open; diligence process underway ➢ Targeting 2H 2027 delivery CUSTOMER DEMAND Capacity figures represent gross MWs.

    Geom Slide Title – 28 Franklin Gothic Med Header – 14 Franklin Gothic Book Content Text – 14 Franklin Gothic Book Chart Content – 10 RGB 33 – 40 – 64 20 – 135 –(deck)

  5. 255 – 177 – 0 2.4 GW Controlled HPC Platform Targeting +250–500 MW of New Critical IT Capacity Annually ➢ Evaluate hundreds of sites annually ➢ Advance only the power-advantaged opportunities ➢ Operate only in markets with regulatory clarity Multi-Market | Multi-Year Runway 522 MW 2.4 GW 5 SITES CONTRACTED CONTROLLED REGIONAL PORTFOLIO 10 Capacity figures represent critical IT MWs.

    Geom Slide Title – 28 Franklin Gothic Med Header – 14 Franklin Gothic Book Content Text – 14 Franklin Gothic Book Chart Content – 10 RGB 33 – 40 – 64 20 – 135 –(deck)

  6. Land & Power: The company signed an additional 100 MW PPA in Yguazú and bought 10 hectares of land, with energization targeted for Q4 2026.

    FORM 51-102F3(press release)

  7. Land & Power: The company signed an additional 100 MW PPA in Yguazú and bought 10 hectares of land, with energization targeted for Q4 2026.

    HIVE Delivers Record Q3 Revenue of $93.1 Million with $32.1 Million Gross Operating Margin, Up Over 6x Year-Over-Year(press release)

  8. IREN IREN Ltd
    Our $3.4bn ARR target represents an early stage of monetization relative to the size of our secured power portfolio, highlighting the scale of the platform we are building.”

    PROCEED WITH PURPOSE. 1 IREN Reports Q2 FY26 Results $3.6bn GPU Financing Secured for Microsoft Contract1 Targeted 140k GPU Expansion on Track to Deliver $3.4bn(earnings release)

  9. This expanded development pipeline supports the Company’s disciplined growth strategy targeting 250 to 500 MW of new contracted capacity annually, aligned with customer demand, power availability, and regional grid conditions.

    TeraWulf Expands Digital and Power Infrastructure Portfolio with Strategic Acquisitions in Kentucky and Maryland Acquisitions add 1.5 GW of load capacity, expan(press release)

  10. Digi Power X Inc. (“Digi Power X” or the “Company”) (Nasdaq: DGXX / TSXV: DGX), an innovative energy infrastructure company, today announced that it will be attending the PTC 2026 in Honolulu, Hawaii this week, with President Alec Amar representing the Company at the conference.

    MATERIAL CHANGE REPORT DATED JANUARY 20, 2026(press release)

  11. Riot intends to convert the full 700 MW of gross power capacity at its Rockdale Site for data center tenants.

    Riot Announces Fee Simple Acquisition of Land and First Data Center Lease with AMD at the Rockdale Site(press release)

  12. Digi Power X expects to begin onboarding initial customers during the first half of 2026, following completion of infrastructure deployment.

    MATERIAL CHANGE REPORT DATED JANUARY 12, 2026(press release)

  13. Clarington, Ohio – 570 MW of power under contract with local utility, expected to be available by end of Q3 2026.

    PRESS RELEASE - BITDEER ANNOUNCES DECEMBER 2025 PRODUCTION AND OPERATIONS UPDATE(production update)

  14. Pursuant to the terms of the LOI, the parties intend to conduct a comprehensive load and interconnection study of up to 1.3 GW, evaluating long-term power availability and grid connectivity for energy-intensive computing applications.

    MATERIAL CHANGE REPORT DATED JANUARY 7, 2026(press release)

  15. Digi Power X plans to begin deployment of its ARMS 200 (AI-Ready Modular Solution) platform in the first quarter of 2026 across its U.S. Tier III facilities.

    MATERIAL CHANGE REPORT DATED JANUARY 6, 2026(production update)

  16. This robust liquidity growth positions Digi Power X to carry out the rollout of its 2026 AI infrastructure development plan, which includes the planned deployment of high-efficiency Tier III AI data centers and expansion of the Company’s power capacity across multiple

    MATERIAL CHANGE REPORT DATED JANUARY 6, 2026(production update)

  17. – Digi Power X Inc. (“Digi Power X” or the “Company”) (Nasdaq: DGXX / TSXV: DGX), an innovative energy infrastructure company, today provided a comprehensive update concerning its financial position and the execution of its AI infrastructure strategy, highlighted by the beginning of deployment of its ARMS 200 Tier III modular data center platform, the completed implementation of its first NVIDIA B200 GPU cluster, the anticipated launch of its GPU-as-a-Service platform NeoCloudz expected in the first quarter of 2026 and the expansion of its intellectual property and global distribution partnerships.

    MATERIAL CHANGE REPORT DATED JANUARY 6, 2026(production update)

  18. Digi Power X’s on-demand compute platform, NeoCloudz, is expected to launch in the first quarter of 2026.

    MATERIAL CHANGE REPORT DATED JANUARY 6, 2026(production update)

  19. Throughout 2025, Digi Power X advanced its AI compute roadmap, including planning and deployment for next-generation AI GPUs (B200-class).

    MATERIAL CHANGE REPORT DATED DECEMBER 24, 2025(press release)

  20. HUT Hut 8 Corp.
    Note: (1) Includes 310 MW of power generation assets Hut 8 expects to sell to TransAlta in early Q1 2026, subject to customary closing conditions including regulatory approval; (2) Excludes 1,000 MW of potential expansion capacity at River Bend, for which Fluidstack holds a ROFO under the River Bend lease

    December 17, 2025(deck)

What this search can find

Snapshot 2026-09-24. The corpus lists 577 documents; 426 have captured text. Search includes 1329 source-linked excerpts across the indexed companies, within 2025-09-23 to 2026-09-24.

The existing extraction rule selects sentences with a forward-looking word and a quantity or dated target, with at most sixty candidates per document. It drops safe-harbor boilerplate. This is not full-text search of every SEC filing, a transcript archive, live news, or an assessment of whether management delivered.

Only excerpts joined to a captured document with a source fingerprint are searchable. Social posts and interviews are not captured. A missing result is a coverage limit, not an answer. Open the guidance ledger for researched promises and outcomes; open filings for the filing index.