Skip to the content
MinerTerminal

Ask company statements

Methodology

Ask about a company

Ask a question about captured statements. Answers use a limited snapshot of company targets and guidance, with original quotes attached. Full filings, live news and later outcomes may be missing.

Search original excerpts

Your question is processed for this response, not saved by the answer service. Do not include private account, portfolio or contact information.

169 matching excerpts

Every result contains all of these whole words: power. Newest document dates first. No semantic matching or synonym expansion.

  1. 255 – 177 – 0 ➢ Strong state and community support ➢ Recognized economic anchor project for the State 15 Justified Data: The Immediate Power Campus Hawesville, KY | 480 MW Campus in MISO 480 MW IMMEDIATE POWER ACTIVE HYPERSCALER DEMAND LOCAL ALIGNMENT EXPANSION OPTIONALITY ➢ Additional scalable capacity ➢ Grid-powered or on-site gen ➢ Active potential customer engagement ➢ Data room open; diligence process underway ➢ Targeting 2H 2027 delivery CUSTOMER DEMAND Capacity figures represent gross MWs.

    Geom Slide Title – 28 Franklin Gothic Med Header – 14 Franklin Gothic Book Content Text – 14 Franklin Gothic Book Chart Content – 10 RGB 33 – 40 – 64 20 – 135 –(deck)

  2. 255 – 177 – 0 WULF Platform Snapshot ➢ Targeting 250–500 MW of annual HPC critical IT capacity signings ➢ Sourcing from a disciplined pipeline of evaluated sites ➢ Deploying capital exclusively into power-advantaged infrastructure ➢ Operating in jurisdictions with clear, durable regulatory frameworks ➢ Repeatable model driving contracted capacity and cash flow growth Scaled, disciplined platform positioned for multi-year growth 2.3 GW 4 Capacity figures represent critical IT MWs.

    Geom Slide Title – 28 Franklin Gothic Med Header – 14 Franklin Gothic Book Content Text – 14 Franklin Gothic Book Chart Content – 10 RGB 33 – 40 – 64 20 – 135 –(deck)

  3. 255 – 177 – 0 Power is the primary constraint in AI infrastructure growth WULF controls scalable, power-advantaged sites across key markets Positioned to partner with utilities as interconnection dynamics evolve Long-term, credit-backed contracts drive stable, recurring cash flows Platform supports targeted 250–500 MW of annual contracted growth WULF Investment Case Power is the constraint.

    Geom Slide Title – 28 Franklin Gothic Med Header – 14 Franklin Gothic Book Content Text – 14 Franklin Gothic Book Chart Content – 10 RGB 33 – 40 – 64 20 – 135 –(deck)

  4. Digi Power X plans to commence site development immediately and targets Phase 1 Ready-for-Service in December 2026, with Phase 2 delivery to follow.

    MATERIAL CHANGE REPORT, DATED MAY 8, 2026(press release)

  5. Upon closing, the combined company is expected to initially operate 53 megawatts (MW) of managed power capacity across five data centers in Iowa, Kentucky, and Tennessee, providing a scaled, multi-site operating footprint with embedded optionality for expansion and workload diversification.

    Sphere 3D and Cathedra Advance Proposed Combination to Establish Power-Optimized Digital Infrastructure Platform(press release)

  6. Cathedra recently announced a new hosting agreement expected to utilize approximately 80% of the 15 MW capacity at its Shire site in Kentucky, representing roughly 25% of Cathedra's current hosting capacity, and establishing what management views as a stable, long term revenue stream.

    Sphere 3D and Cathedra Advance Proposed Combination to Establish Power-Optimized Digital Infrastructure Platform(press release)

  7. Stamford, Connecticut, and Toronto, Ontario - May 7, 2026 - Sphere 3D Corp. (NASDAQ: ANY) ("Sphere 3D") and Cathedra Bitcoin Inc. ("Cathedra") today provided an update regarding their previously announced proposed business combination (the "Transaction"), which remains expected to close in the near term, pending the satisfaction of customary closing conditions and required approvals.

    Sphere 3D and Cathedra Advance Proposed Combination to Establish Power-Optimized Digital Infrastructure Platform(press release)

  8. The transaction, subject to customary regulatory approvals and closing conditions, is expected to be funded using existing liquidity and close in the third quarter of 2026.

    Core Scientific Plans Expansion to 1.5 Gigawatts of Gross Power at Muskogee, Oklahoma Campus AUSTIN, Texas, May 6, 2026 – Core Scientific, Inc. (Nasdaq: CORZ) ((press release)

  9. The acquisition is expected to meaningfully accelerate the Company’s timeline for delivering significant new capacity for future customers in Muskogee, and construction has already begun on a second, unleased 82.5 MW building, with initial delivery expected in the fourth quarter of 2027.

    Core Scientific Plans Expansion to 1.5 Gigawatts of Gross Power at Muskogee, Oklahoma Campus AUSTIN, Texas, May 6, 2026 – Core Scientific, Inc. (Nasdaq: CORZ) ((press release)

  10. To support this planned expansion, Core Scientific has secured approximately 250 acres of land.

    Core Scientific Plans Expansion to 1.5 Gigawatts of Gross Power at Muskogee, Oklahoma Campus AUSTIN, Texas, May 6, 2026 – Core Scientific, Inc. (Nasdaq: CORZ) ((press release)

  11. -more- In Muskogee, the Company’s current leased 70 MW building designed to support the Nvidia GB300 platform is progressing through final testing as well as commissioning and is on track for a second quarter 2026 delivery to its customer.

    Core Scientific Plans Expansion to 1.5 Gigawatts of Gross Power at Muskogee, Oklahoma Campus AUSTIN, Texas, May 6, 2026 – Core Scientific, Inc. (Nasdaq: CORZ) ((press release)

  12. 6 Total Leasable Power Pipeline* Our current power pipeline includes ~4.5 GWs of gross utility power capacity, equating to ~3.0 GWs of customer leasable power potential, including anticipated behind-the-meter power *Does not include ~590 MW of already contracted power 1.

    First Quarter Fiscal 2026 Earnings Call May 6, 2026 1(deck)

  13. 8 Pecos, TX & Muskogee, OK Planned Expansions Pecos, TX Anticipated Power Details ~300 MW CURRENT AVAILABLE POWER ~300 MW ADDITIONAL GRID- CONNECTED UTILITY POWER 1 + + Behind-the-Meter = ~1.5 GW TOTAL GROSS POWER CAPACITY POTENTIAL Muskogee, OK Anticipated Power Details ~100 MW CURRENT AVAILABLE POWER TIED TO THE COREWEAVE CONTRACT ~440 MW THROUGH THE POLARIS ACQUISITION 2 + + Behind-the-Meter & Additional Grid Connected Power 3 = ~1.5 GW TOTAL GROSS POWER CAPACITY POTENTIAL 1.

    First Quarter Fiscal 2026 Earnings Call May 6, 2026 1(deck)

  14. Expect initial power delivery in late 2027.

    First Quarter Fiscal 2026 Earnings Call May 6, 2026 1(deck)

  15. 12 CoreWeave is contracted for ~590 MW of leased customer power capacity across 5 of our sites Denton, TX Leased power: ~260MW Full completion on track for midyear Dalton, GA Leased power: ~175MW Delivered Phase 1, a 30 MW site.

    First Quarter Fiscal 2026 Earnings Call May 6, 2026 1(deck)

  16. Full completion on track for early 2027 Muskogee, OK Leased power: ~70MW On track for midyear delivery Marble, NC Leased power: ~65MW Fully handed over to customer Austin, TX Leased power: ~20MW Fully handed over to customer Total leased power ~590 MW

    First Quarter Fiscal 2026 Earnings Call May 6, 2026 1(deck)

  17. •Closed on the acquisiton of land and power in Hunt County, Texas for approximately $233 million, which is expected to support ~430 MW of gross power capacity, with an approved ERCOT interconnection ramp schedule.

    Core Scientific Announces First Quarter Fiscal Year 2026 Results(earnings release)

  18. •Expanded the Company’s total gross power capacity pipeline to 4.5 GW, including planned 1.5 GW expansions at each of the Company’s Muskogee, Oklahoma and Pecos, Texas campuses.

    Core Scientific Announces First Quarter Fiscal Year 2026 Results(earnings release)

  19. Expected to close in the second half of 2026, subject to regulatory approvals, including clearance under the

    MARA Advances Its Optimized Digital Infrastructure Strategy with Agreement to Acquire Long Ridge Energy & Power(press release)

  20. MARA expects construction of an initial AI/Critical IT buildout to begin in 1H 2027, with initial capacity accelerated by its current 200 MW of capacity and targeted to be ready for service in mid-2028.

    MARA Advances Its Optimized Digital Infrastructure Strategy with Agreement to Acquire Long Ridge Energy & Power(press release)

What this search can find

Snapshot 2026-09-24. The corpus lists 577 documents; 426 have captured text. Search includes 1329 source-linked excerpts across the indexed companies, within 2025-09-23 to 2026-09-24.

The existing extraction rule selects sentences with a forward-looking word and a quantity or dated target, with at most sixty candidates per document. It drops safe-harbor boilerplate. This is not full-text search of every SEC filing, a transcript archive, live news, or an assessment of whether management delivered.

Only excerpts joined to a captured document with a source fingerprint are searchable. Social posts and interviews are not captured. A missing result is a coverage limit, not an answer. Open the guidance ledger for researched promises and outcomes; open filings for the filing index.