operatinglocated at a street address that the Census geocoder puts along the road; the buildings can be some distance away
Corsicana Facility
RIOT Corsicana, TX
Imagery: NASA Blue Marble, a 2004 global composite, and in the United States USGS aerial imagery, a mosaic of different dates. No single imagery date applies, and the site may have changed since. A flat view of the ground: no terrain.
- Energized
- 400 MW
- Nameplate
- 1,000 MW
- Stage
- operating
- Power source
- grid
- Ownership
- owned
- Grid operator
- ERCOT
- Announced
- Apr 27, 2022source dated Apr 27, 2022
- Energized
- Apr 2024source dated May 1, 2024
- Place named in the filing
- Corsicana, TXlocated at a street address that the Census geocoder puts along the road; the buildings can be some distance away
The point is the street address placed by the U.S. Census geocoder along its street segment, not the building. Address 6980 FM 709, Corsicana, TX geocoded by U.S. Census Bureau Geocoder (matched 6980 FM 709 S, CORSICANA, TX, 75110). State record lists Owner Name: Riot Platforms, Inc (Castle Rock, CO) and Facility Name 'Riot Platforms Corsicana Data Center'. Site match: Facility name says Corsicana Data Center; county Navarro; Riot has only one Corsicana campus. Document that names the place; U.S. Census Bureau Geocoder (public domain).
Source: 10-Q Q2 2026 (filed Aug 10, 2026); read Sep 6, 2026.
Company photos: any pictures are in the filing above or on the company page. They belong to the company and are not copied here.
MARA