Tydal

BTDR Tydal

Imagery: NASA Blue Marble, a 2004 global composite. No single imagery date applies, and the site may have changed since. A flat view of the ground: no terrain.

Energized
180 MW
Nameplate
225 MW
Stage
under construction
Power source
hydro
Ownership
owned
Grid operator
other
Announced
Dec 15, 2021source dated Dec 15, 2021
Place named in the filing
Tydallocated at a filed address

The point is the address point in the national register, not the building; the register marks its placement as not verified. Address Stugudalsvegen 190, 7590 Tydal, Norway resolved by the Geonorge address register (point of Stugudalsvegen 190, TYDAL). The address is on the page of Tydal Data Center AS, which the company's own filing names as its subsidiary. Document that names the place; (c) Kartverket, CC BY 4.0.

Source: 6-K EX-99.1 Aug 10, 2026 (Q2 2026 unaudited results); read Sep 6, 2026.